Tender Details

Particulars Details
Title
Improvements, Strengthening, Construction Of Rcc Gutter And Retaining Wall To Belewadi Kalamma To Dhamane Road. Odr.112, Taluka Ajara, Dist. Kolhapur
Description
Improvements, Strengthening, Construction Of Rcc Gutter And Retaining Wall To Belewadi Kalamma To Dhamane Road. Odr.112, Taluka Ajara, Dist. Kolhapur
Organisation Government of Maharashtra
Tender Id 2023_PWDRP_976730_1
Reference
Number
E Notice No.58 for 2023-2024
Tender Fee 1200
EMD 98000
Tender Value
Place Executive Engineer P.W. (South) Division, Kolhapur
Link https://mahatenders.gov.in
Start Date December 29, 2023 22:30
End Date

05/01/2024 ( Expired 540 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Construction of rcc culvert and retaining wall to muktidham in village salupura zone no. 25 ward no. 66 file no. 100/25x3/6

Construction of rcc culvert and retaining wall to muktidham in village salupura zone no. 25 ward no. 66 file no. 100/25x3/6

Read more
Zone-03, ward-10, construction of cc road and rcc drain from beside of ramadhar tripathi ji house to kanha park.

Zone-03, ward-10, construction of cc road and rcc drain from beside of ramadhar tripathi ji house to kanha park.

Read more
Construction of bituminous road, box culvert and retaining at shri dadaji dham to pandhana road khandwa.

Construction of bituminous road, box culvert and retaining at shri dadaji dham to pandhana road khandwa.

Read more
Raising strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Raising, strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Read more
Construction of random rubble masonry retaining wall with synthetic geogerids on kekuri pamua to nayabazar road from ch. 0 m to ch. 352 m under sdmf for the year 2024-25 in lakhimpur district.

Construction of random rubble masonry retaining wall with synthetic geogerids on kekuri pamua to nayabazar road from ch. 0 m to ch. 352 m under sdmf for the year 2024-25 in lakhimpur district.

Read more
Construction of hl bridge skew 3 span 12m each effective over lissara drain xing bathinda kheowali road to nh64 via jassi sangat phullo jai singh including its approaches road di dismantling and 2 point 5m high rcc retaining wall pmgsy iii

Construction of hl bridge skew 3 span 12m each effective over lissara drain xing bathinda kheowali road to nh64 via jassi sangat phullo jai singh including its approaches road di dismantling and 2 point 5m high rcc retaining wall pmgsy iii

Read more
Repair of various rural link roads in mc shahkot group no.1 (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structures) with 5 year maintenance under nabard loan/mc/mb funds dist

Repair of various rural link roads in mc shahkot group no.1 (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structures) with 5 year maintenance under nabard loan/mc/mb funds dist

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction of rcc drain and cc road at near the h.o lt dinesh chakraborty to h.o bachoudhury connected with gb indranagar iti road under ward no10 amc

Construction of rcc drain and cc road at near the h.o lt dinesh chakraborty to h.o bachoudhury connected with gb indranagar iti road under ward no10 amc

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise