Tender Details
Particulars | Details |
---|---|
Title |
Nuppl/Gtps Ahp Package Balance Civil Works
|
Description |
Nuppl/Gtps Ahp Package Balance Civil Works
|
Organisation | Neyveli Uttar Pradesh Power Limited (NUPPL) | Public Sector Undertakings |
Tender Id | 2425020005 |
Reference Number |
2425020005 |
Tender Fee | 0 |
EMD | 23.23 Lakh |
Tender Value | |
Place | Kanpur |
Link | https://procure.nlcindia.in/specification/tender/2425020005 |
Start Date | July 20, 2024 22:00 |
End Date |
06/08/2024 ( Expired 304 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read morePackage iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreThree years rate contract for civil works at well sites for work over rig operations in ahmedabad as(2025-28)
Three years rate contract for civil works at well sites for work over rig operations in ahmedabad as(2025-28)
Read moreLot i package civil works of dulhasti stage ii hep, kishtwar, jammu and kashmir
Lot i package civil works of dulhasti stage ii hep, kishtwar, jammu and kashmir
Read moreLot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india
Read moreLac-ads-providing paving of tiles in anganavadi varnamnagar-improvements to aganavadi varnamnagar road in ward 19 of edathala grama panchayath.-general civil work
Very&#x0d pathetic condition due to waterlogged area .this&#x0d estimate is proposed to upgrade the road&#x0d with 100 mm interlocking tile works and&#x0d provisions for earth filling, gsb, wmm,pcc ,&#x0d dr masonary and naming board are inluded in&#x0d this estimate.
Read moreMaintenance of civil works at vinod nagar staff quarter (for 03 years)
Maintenance of civil works at vinod nagar staff quarter (for 03 years)
Read moreConstruction of 132/33 kv, 2x50 mva gis substation at hathi bhata (ajmer) alongwith associated transmission lines including survey, supply of all equipment/mate rials, erection (including civil works), testing and commissioning.
Construction of&#x0d 132/33 kv, 2x50 mva&#x0d gis substation at&#x0d hathi bhata&#x0d (ajmer)&#x0d alongwith&#x0d associated&#x0d transmission&#x0d lines including&#x0d survey, supply&#x0d of all&#x0d equipment/mate&#x0d rials, erection&#x0d (including civil&#x0d works), testing&#x0d and&#x0d commissioning.
Read moreBalance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.
Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.
Read moreof your Industry type