Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Jungle Clearance Silt Clearance And Scrapping Of Malihabad Dy From Km 0.000 To 8.000 (Lot 24)
|
| Description |
Jungle Clearance Silt Clearance And Scrapping Of Malihabad Dy From Km 0.000 To 8.000 (Lot 24)
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPIDC_847804_1 |
|
Reference Number |
04/EE/2023-24 |
| Tender Fee | 677 |
| EMD | 6600 |
| Tender Value | |
| Place | NWMP HARDOI |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | October 09, 2023 16:30 |
| End Date |
Expired
16/10/2023
Expired 975 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of chebri to nagalani road km 0.000 to 3.000 hp09830
Construction of chebri to nagalani road km 0.000 to 3.000 hp09830
Read moreIndependent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Independent engineer services for 2 l. paved shoulders/ 4 laning of damoh jabalpur package-1 and 3 section of nh-34 from km 0.000 to km 43.500 and km 66.800 to km 101.563 under nh (o) in madhya pradesh on ham
Read moreConstruction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Construction / improvement of existing cl-9 road to nhdl (ps) specifications with paved shoulder from muguthang of design chainage km 0.000 to naku of design chainage km 11.755 (total design length 11.755 km) nh-310 ag in the state of sikkim
Read moreInternal clearance of tarao...
Internal clearance of taraori minor from rd 0 to 10050 before flood season 2026.
Read moreEarth work in in filling rain cuts, side cuts, pots holes,ruts ,jungle cutting and repair of brick soling between km 12.900 to km 13.500 of vikramjot dhushwa bund on left bank of ghaghra river in distt. basti.
Earth work in in filling rain cuts, side cuts, pots holes,ruts ,jungle cutting and repair of brick soling between km 12.900 to km 13.500 of vikramjot dhushwa bund on left bank of ghaghra river in distt. basti.
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreThe controller, printing and stationary, department, haryana, panchkula. list comprising of items from sr. no. 01 to 124 items (single lot of 124 items)
The controller, printing and stationary, department, haryana, panchkula. list comprising of items from sr. no. 01 to 124 items (single lot of 124 items)
Read moreRenovation of washroom and fixing of tiles at corridor at ecmu department adjacent to dy. se office chamber in iit (ism) dhanbad.
Renovation of washroom and fixing of tiles at corridor at ecmu department adjacent to dy. se office chamber in iit (ism) dhanbad.
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreRestoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Read moreof your Industry type