Tender Details
Particulars | Details |
---|---|
Title |
Survey, Design, Supply, Transportation, Carriage, Erection, Testing And Commissioning For Creation Of 200 Kva Sub Station Along With Laying Of 11 Kv Ht Line At Stage 0 Of Wss Kans Kassan And Creation Of 2 Nos 200 Kva Sub Stations Along With Laying
|
Description |
Of 11 Kv Ht Line At Stage 0 (2 Sites) Of Wss Gajore In Sub Division Pouni Under Deposit Contribution Work Of Jal Shakti (Phe) For Jal Jeevan Mission (Jjm) On Turnkey Basis In Jurisdiction Of Electric Division Jpdcl Reasi
|
Organisation | Government of Jammu and Kashmir |
Tender Id | 2023_PDD_239620_1 |
Reference Number |
e NIT 63 of 2023-24 dated 08.12.2023 |
Tender Fee | 1000 |
EMD | 77040 |
Tender Value | |
Place | Office of Executive Engineer ED JPDCL Reasi |
Link | https://jktenders.gov.in |
Start Date | December 09, 2023 14:30 |
End Date |
18/12/2023 ( Expired 524 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Supply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Read moreSupply, erection, testing, commissioning for creation of 250 kva sub-station alongwith laying of ht line and laying of lt line under jjm scheme at wss dhan under the jurisdiction of electric division div-i (jpdcl) jammu on turn key basis
Supply, erection, testing, commissioning for creation of 250 kva sub-station alongwith laying of ht line and laying of lt line under jjm scheme at wss dhan under the jurisdiction of electric division div-i (jpdcl) jammu on turn key basis
Read moreSupply installation testing and commissioning for creation of 100kva substation along with laying of ht lt line at nimoo land near gurudwara leh under district capes budget 2025 26
Same as above
Read moreEngineering, supply, erection, commissioning and testing of scada-dms automation package for two (02) nos. central control centre and 24 nos. sub-stations towards supervision and control of 11 kv network in dvc command area on turnkey basis
Engineering, supply, erection, commissioning and testing of scada-dms automation package for two (02) nos. central control centre and 24 nos. sub-stations towards supervision and control of 11 kv network in dvc command area on turnkey basis
Read moreErection of sub-station,ht and lt line for effecting tildapara ldtw (6 nos)
Erection of sub-station,ht and lt line for effecting tildapara ldtw (6 nos)
Read moreDesign, supply, erecting, testing and commissioning of 11kv ht distribution line, 200kva transformer, cctv camera and fencing at dangurli lift irrigation scheme, tah.dist.- gondia.
Design, supply, erecting, testing and commissioning of 11kv ht distribution line, 200kva transformer, cctv camera and fencing at dangurli lift irrigation scheme, tah.dist.- gondia.
Read moreSurvey, design, fabrication, supply, installation, testing, commissioning with rms of 19 kw capacity of gcrt at itdp pandharkwada office and cumu of 10,000 lpd 1x500. 20 nos of etc solar water heater at 10 various gov. ashram schools in ytl. district
Survey, design, fabrication, supply, installation, testing, commissioning with rms of 19 kw capacity of gcrt at itdp pandharkwada office and cumu of 10,000 lpd 1x500. 20 nos of etc solar water heater at 10 various gov. ashram schools in ytl. district
Read moreDesign, engineering, manufacture, survey, supply, transportation, erection, testing n commissioning for (i) thickening of existing 33 kv khellani-doda-ii line and (ii) erection of new 33kv line on acsr wolf conductor from bheli ghat to dhara
Design, engineering, manufacture, survey, supply, transportation, erection, testing n commissioning for (i) thickening of existing 33 kv khellani-doda-ii line and (ii) erection of new 33kv line on acsr wolf conductor from bheli ghat to dhara
Read moreSurvey, design, fabrication, supply, installation, testing, commissioning with rms of total cumu. 12 kwp gcrt, 02 nos. 10hp dc solar pumping with rms, 02 nos. of solar based led high mast 9 mtr. with rms at various sites under gp pardi, taluka morshi
Survey, design, fabrication, supply, installation, testing, commissioning with rms of total cumu. 12 kwp gcrt, 02 nos. 10hp dc solar pumping with rms, 02 nos. of solar based led high mast 9 mtr. with rms at various sites under gp pardi, taluka morshi
Read moreSurvey soil investigation design construction and commissioning of sewerage network of 252.80 km trunk main of 6.03 km including 5 intermittent pumping stations 2 stp having capacity 24 mld and 12 mld respectively along with pumping station excavatio
Survey soil investigation design construction and commissioning of sewerage network of 252.80 km trunk main of 6.03 km including 5 intermittent pumping stations 2 stp having capacity 24 mld and 12 mld respectively along with pumping station excavatio
Read moreof your Industry type