Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Water Pump Sheds Boring Of Tube Well Including Supply Installation Of Water Pump And Associated Electrical And Plumbing Works At Tezpur University Campus
|
Description |
Civil Works
|
Organisation | Tezpur University | Central Govt. Ministry/Department |
Tender Id | 2024_TEZU_838820_1 |
Reference Number |
TU/EC/CIVIL/471/2024-25 DATED 09-12-2024 |
Tender Fee | 500 |
EMD | 4850 |
Tender Value | |
Place | Tezpur University Napaam Tezpur |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=881656 |
Start Date | December 10, 2024 00:00 |
End Date |
17/01/2025 ( Expired 171 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Read more82655 provision of deficient water supply and connected works at nae meenambakkam chennai under age (i) chennai
82655 provision of deficient water supply and connected works at nae meenambakkam chennai under age (i) chennai
Read moreConstruction of various 220 kv transmission lines associated with 220kv gss bambloo (dist-bikaner) including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning (turnkey project) bn9019002517
Construction of various 220 kv transmission lines associated with 220kv gss bambloo (dist-bikaner) including survey, supply of all equipments/materials, erection (including civil works), testing and commissioning (turnkey project) bn9019002517
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreAAAAAAAAAA
Login to viewConstruction of htfif building including civil and electrical works at arpf campus near devi ahilyabai holkar sabji mandi for rrcat, indore.
Read moreSupply, installation, test and commissioning of jig boring machine for the project setting up of centre for intermediate level maintenance (cilm) of lm 2500 gas turbines at ins eksila
Supply, installation, test and commissioning of jig boring machine for the project setting up of centre for intermediate level maintenance (cilm) of lm 2500 gas turbines at ins eksila
Read morePackage 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Read moreI) design, architecture, engineering and construction of building for 110/11 kv gis substation, and (ii)design supply, installation and commissioning of 110/11kv gis substation in iit madras campus
I) design, architecture, engineering and construction of building for 110/11 kv gis substation, and (ii)design supply, installation and commissioning of 110/11kv gis substation in iit madras campus
Read moreDrilling of 150 mm dia tube well with installation of india mark handpump set including construction of platform complete at different location at site ward no.66.file no.173/25x9/1.
Drilling of 150 mm dia tube well with installation of india mark handpump set including construction of platform complete at different location at site ward no.66.file no.173/25x9/1.&#x0d &#x0d
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at amargarh, district malerkotla, punjab under amrut 2.0 scheme.
Canal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at amargarh, district malerkotla, punjab under amrut 2.0 scheme.
Read moreof your Industry type