Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Compound; Rubber, Hardner, Cleaner, 450 Gm
|
| Description |
|
| Organisation | Materials Management | Ministry of Coal |
| Tender Id | GEM/2023/B/3969074 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | September 16, 2023 01:46 |
| End Date |
Expired
06/10/2023
Expired 1064 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
ROYAL CONSTRUCTION
1958800
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | KPPA MINE TECH | Make : NILOS Model : BELT CLAMP Title : HYDRAULIC BELT CLAMP | 03-10-2023 20:02:43 | Registered with designated Agency / Authority | N/A | Disqualified |
| 2 | M/S INTER SIGNS | Make : ACTIVELITE Model : BELT REPAIR SOLOUTION Title : BELT REPAIR SOLOUTION | 30-09-2023 21:18:08 | Registered with designated Agency / Authority | MSE | Disqualified |
| 3 | ROYAL CONSTRUCTION | Make : BELT CARE Model : REPAIR KIT FOR CONVEYOR BELTS Title : REPAIR KIT FOR CONVEYOR BELTS | 26-09-2023 13:04:53 | Offline upload | MII | Qualified |
| 4 | WAIDHAN ENGINEERING & INDUSTRIES PVT LTD | Make : WAIDHAN Model : W501 Title : instant conveyor belt repair kit | 04-10-2023 16:13:23 | Registered with designated Agency / Authority | MSE | Disqualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | ROYAL CONSTRUCTION(MII) | Item Categories : COMPOUND; RUBBER, HARDNER, CLEANER, 450GM | 2180000.00 | L1 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| REPAIR KIT FOR CONVEYOR BELTS | BELT CARE | REPAIR KIT FOR CONVEYOR BELTS | 200 | ₹ 1958800.000 |
Construction of compound wall for hadapad appanna samusdaya bhavan
Construction of compound wall for hadapad appanna samusdaya bhavan
Read moreGeneral stall no ghc-05 at guest house compound belagavi.(available from 15-01-2027)
General stall no ghc-05 at guest house compound belagavi.(available from 15-01-2027) area 337 sqft, mlf rs 14641, emd rs 43923.
Read moreSupply of cow rubber mats to 14 camp office for a period of 06 months
Supply of cow rubber mats to 14 camp office for a period of 06 months
Read moreGeneral stall under open space no ghc-13 at guest house compound belagavi.(available from 20-12-2026)
General stall under open space no ghc-13 at guest house compound belagavi.(available from 20-12-2026)area 200 sqft, mlf rs 8293, emd rs 24879.
Read moreGeneral stall open space no ghc-15 at guest house compound belagavi(schedule tribe reserve)(avl dt.20-12-2026)
General stall open space no ghc-15 at guest house compound belagavi(schedule tribe reserve)(avl dt.20-12-2026)area 150 sqft, mlf rs 6074,emd rs 18222
Read moreRubber seal replacement and minor repairs to gate nos. 01 & 02 and seven stop-log elements at bp dam.
Rubber seal replacement and minor repairs to gate nos. 01 & 02 and seven stop-log elements at bp dam scope of work as per tender document.
Read moreReplacement of damaged sludge disposal pipeline from road crossing near additional clarifier along rtps compound wall up to existing pipe rack including supply of required material
Replacement of damaged sludge disposal pipeline from road crossing near additional clarifier along rtps compound wall up to existing pipe rack including supply of required material & as per tender document
Read moreConstruction work of swm site compound wall as civil works in detailed project report approved for integrated solid waste management under sbm scheme for turvihal town panchayat (phase-6)
Construction work of swm site compound wall as civil works in detailed project report approved for integrated solid waste management under sbm scheme for turvihal town panchayat (phase-6)
Read moreConstruction of compound wall and installation of said hostel concrete or tiles for the exterior post matric girls hostel bcwd 2062 at hirekerur town in hirekerur taluk of haveri district.
Construction of compound wall and installation of said hostel concrete or tiles for the exterior post matric girls hostel bcwd 2062 at hirekerur town in hirekerur taluk of haveri district.
Read moreContinuation work of construction work of swm site compound wall as civil works in detailed project report approved for integrated solid waste management under sbm scheme for turvihal town panchayat (phase-5)
Continuation work of construction work of swm site compound wall as civil works in detailed project report approved for integrated solid waste management under sbm scheme for turvihal town panchayat (phase-5)
Read moreof your Industry type