Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Invitation For Bids: Widening, Strengthening And Reconstruction Of Nh 75 And Nh 343 🛣️ Road Division, Garhwa, Invites Bids From Experienced Contractors For The Comprehensive Widening, Strengthening, And Reconstruction Work Of The National Highway (Nh 75) From Dental More To Nawadohari (Including Nh 343) Via Hoor Charmuhan Road, Spanning A Total Length Of 15.132 Km. 📅 Bid Submission Deadline: April 10, 2024, 12:00 Pm Tender Fee: Inr 10,000 Earnest Money Deposit (Emd): Inr 62,09,000 Interested Bidders Must Review The Detailed Project Specifications And Submit Their Bids In Accordance With The Tender Documents And Guidelines. This Project Is A Key Part Of The Government's Infrastructure Development Initiatives. Keywords: Road Division, Garhwa, Nh 75, Nh 343, Infrastructure Development, Highway Construction, Bid, Tender, Emd, Earnest Money Deposit| Particulars | Details |
|---|---|
| Title |
Widening, Strengthening And Reconstruction Work Of Dental More (On Nh 75) To Nawadohari (On Nh 343) Via Hoor Charmuhan Road (Total Length 15.132 Km.) Under Road Division, Garhwa
|
| Description |
Widening, Strengthening And Reconstruction Work Of Dental More (On Nh 75) To Nawadohari (On Nh 343) Via Hoor Charmuhan Road (Total Length 15.132 Km.) Under Road Division, Garhwa
|
| Organisation | RCD EinC | State Govt. and UT |
| Tender Id | 2024_CECOM_85011_1 |
|
Reference Number |
RCD/Garhwa/277/2023-24 |
| Tender Fee | 10000 |
| EMD | 62.09 Lakh |
| Tender Value | |
| Place | Dental More (on NH-75) to Nawadohari |
| Link |
View Original Tender Notice
https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=114054 |
| Start Date | March 13, 2024 16:00 |
| End Date |
Expired
10/04/2024
Expired 821 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConstruction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreShifting with reconstruction of existing electrical poles for construction of road from nh-5a to masakani village jadupur gp under r.w.e.s kendrapara.
Shifting with reconstruction of&#x0d existing electrical poles for&#x0d construction of road from nh-5a to&#x0d masakani village jadupur gp under&#x0d r.w.e.s kendrapara.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreSupplying all labour t and p for laying of distribution network pipeline installation of sluice valve and chamber damaged during pwd road widening work at pws to badabharandi and pujariguda of badabharandi g.p under umerkote block
Supplying all labour t and p for laying of distribution network pipeline installation of sluice valve and chamber damaged during pwd road widening work at pws to badabharandi and pujariguda of badabharandi g.p under umerkote block
Read moreof your Industry type