Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply, Erection, Testing &Amp Commissioning And Modification Of 25 Kv Ohe Including Rc, Psi Work &Amp Modification Of 33 Kv Or 11 Kv Or Lt Lines Between Rourkela Panposh In Connection With 3rd Line Work Between Rourkela Jharsuguda Section In Chakradharpur Division
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77230804 |
|
Reference Number |
01-TENDER-EL-CON-CKP-24-2 |
| Tender Fee | 0 |
| EMD | 5.13 Lakh |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77230804/viewNitPdf_4704323.pdf |
| Start Date | September 09, 2024 23:49 |
| End Date |
Expired
14/10/2024
Expired 734 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fire safety audit at (nsg-2: tatanagar and rourkela and nsg-3 chakradharpur and jharsuguda) railway stations under chakradharpur division.(3rd call)
Fire safety audit at (nsg-2: tatanagar and rourkela and nsg-3 chakradharpur and jharsuguda) railway stations under chakradharpur division.(3rd call)
Read moreSupply and installation of 42 kv lightning arrester (la) with accessories in system-i and modification of la installed in system-ii at various power supply installation (psi) in 2x25 kv ohe unit under cgm/ddu.
Supply and installation of 42 kv lightning arrester (la) with accessories in system-i and modification of la installed in system-ii at various power supply installation (psi) in 2x25 kv ohe unit under cgm/ddu.
Read moreOhe modification work and other allied work in connection with elimination of level crossing gate 241 between bajwa-karchiya at km 404/24-26
Ohe modification work and other allied work in connection with elimination of level crossing gate 241 between bajwa-karchiya at km 404/24-26
Read more25 kv ohe modification work due to provision of advance trip maintenance centre at electric trip shed pryj in prayagraj division of n c railway.
25 kv ohe modification work due to provision of advance trip maintenance centre at electric trip shed pryj in prayagraj division of n c railway.
Read more25 kv do fuse link 1 amp capacity for 25 kv dropout fuse switch confirming to rdso spec. eti/psi/14(1/86) with a & c slip no - 1 or latest.
25 kv do fuse link 1 amp capacity for 25 kv dropout fuse switch confirming to rdso spec. eti/psi/14(1/86) with a & c slip no - 1 or latest.
Read moreConstruction of hathi passage (overpass ; 55.0 m wide, span 1 x 52.535m composite girder) for movement of elephant at km: 500/15-17 between dhutra and bagdehi in rourkela- jharsuguda section & (overpass; 55.0 m wide, span 1 x 52.36m & 1 x 36.0m composite girder) for movement of elephant at km: 405/5-10 between banspani and jaroli in dangoaposi - jaroli section of odisha state in chakradharpur division in south eastern railway
Construction of hathi passage (overpass ; 55.0 m wide, span 1 x 52.535m composite girder) for movement of elephant at km: 500/15-17 between dhutra and bagdehi in rourkela- jharsuguda section & (overpass; 55.0 m wide, span 1 x 52.36m & 1 x 36.0m composite girder) for movement of elephant at km: 405/5-10 between banspani and jaroli in dangoaposi - jaroli section of odisha state in chakradharpur division in south eastern railway
Read moreTvc division - ohe modification in connection with construction of rob for nhai at km 55/3-4 between alappuzha and tumboli stations and at km 57/13-14 between alappuzha and punnapra stations in ernakulam - kayankulam section
Tvc division - ohe modification in connection with construction of rob for nhai at km 55/3-4 between alappuzha and tumboli stations and at km 57/13-14 between alappuzha and punnapra stations in ernakulam - kayankulam section
Read moreName of work: design, supply, erection, testing and commissioning of ohe electrification (25 kv ac, 50 hz) and psi works (sp/ssp) in connection with idh yard remodelling (phase-ii) and ohe electrification (2x25 kv ac,50 hz) of bhandai flyover for etawah-bound down trains , agra division, n.c. railway.
Name of work: design, supply, erection, testing and commissioning of ohe electrification (25 kv ac, 50 hz) and psi works (sp/ssp) in connection with idh yard remodelling (phase-ii) and ohe electrification (2x25 kv ac,50 hz) of bhandai flyover for etawah-bound down trains , agra division, n.c. railway.
Read moreModification in ohe due to construction of 2 lane rob no. 157 by increasing height and rebuilding of old rob at km 83/5-6 between agra fort - idgah stations
Modification in ohe due to construction of 2 lane rob no. 157 by increasing height and rebuilding of old rob at km 83/5-6 between agra fort - idgah stations
Read moreDesign, supply, erection, testing, commissioning of 2 x 25 kv ac, single phase ohe between pachora (including pachora yard) to jamner including ohe modification work in pachora yard & removal of ohe infringement, in connection with gauge conversion work from pachora-jamner (approx. rkm is 53.3 km & approx. tkm is 80km, project commences from km 374.300 (distance from mumbai) to km 427.600 of existing narrow gauge chainage) in bhusawal division of central railway.
Design, supply, erection, testing, commissioning of 2 x 25 kv ac, single phase ohe between pachora (including pachora yard) to jamner including ohe modification work in pachora yard & removal of ohe infringement, in connection with gauge conversion work from pachora-jamner (approx. rkm is 53.3 km & approx. tkm is 80km, project commences from km 374.300 (distance from mumbai) to km 427.600 of existing narrow gauge chainage) in bhusawal division of central railway.
Read moreof your Industry type