Tender Details
Particulars | Details |
---|---|
Title |
Lifting Of Existing Old Damaged Pipes And Lowering Of New Seamless Pipes 150mm Dia And 225m Length In Vertical Stowing Range Of Bunker No. 2 At Jambad Ug Colliery
|
Description |
Lifting Of Existing Old Damaged Pipes And Lowering Of New Seamless Pipes 150mm Dia And 225m Length In Vertical Stowing Range Of Bunker No. 2 At Jambad Ug Colliery
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_329939_1 |
Reference Number |
GM/KAJ/PCD/24-25/4244 Date 19.02.2025 |
Tender Fee | 0 |
EMD | 4400 |
Tender Value | |
Place | Kajora |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342010 |
Start Date | February 24, 2025 16:30 |
End Date |
06/03/2025 ( Expired 45 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Read moreConstruction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Construction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)
Read moreWidening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Widening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Read moreWidening and strengthening of single, intermediate lane to 2 lane from existing chainage (km 100.660 to km 106.540) design chainage (km 78.785 to km 84.600) on nh-123 (new nh no. 507) in the state of uttarakhand
Widening and strengthening of single, intermediate lane to 2 lane from existing chainage (km 100.660 to km 106.540) design chainage (km 78.785 to km 84.600) on nh-123 (new nh no. 507) in the state of uttarakhand
Read moreCleaning of existing garland drain of length 1360.00 mt and cutting of new garland drain of length 1401 mt at different locations in mines for monsoon preparation work under karma project of kuju area.
Cleaning of existing garland drain of length 1360.00 mt and cutting of new garland drain of length 1401 mt at different locations in mines for monsoon preparation work under karma project of kuju area.
Read moreLaying new drainage line in place of old and damaged drainage line in the back lines of chanduwala road under zone no. 15 ward no. 02.
Laying new drainage line in place of old and damaged drainage line in the back lines of chanduwala road under zone no. 15 ward no. 02.
Read moreLaying of new storm water line in place of damaged strom water line at motilal ki chal, mangilal ki chal, kanhiyalal ki chal and other lanes in ward no. 26 under zone no. 09
Laying of new storm water line in place of damaged strom water line at motilal ki chal, mangilal ki chal, kanhiyalal ki chal and other lanes in ward no. 26 under zone no. 09
Read moreWork of construction of 3 no new 200 mm dia tube well, deepening of existing tube wells, replacement of mono block pump and er panel at mvs kheda-norangpura--tewri-sewro ki dhani--bhamod with 24 months defective liability
Work of construction of 3 no new 200 mm dia tube well, deepening of existing tube wells, replacement of mono block pump and er panel at mvs kheda-norangpura--tewri-sewro ki dhani--bhamod with 24 months defective liability
Read moreWork of construction of 3 no new 200 mm dia tube well, deepening of existing tube wells, replacement of mono block pump and er panel at mvs kheda-norangpura--tewri-sewro ki dhani--bhamod with 24 months defective liability
Work of construction of 3 no new 200 mm dia tube well, deepening of existing tube wells, replacement of mono block pump and er panel at mvs kheda-norangpura--tewri-sewro ki dhani--bhamod with 24 months defective liability
Read moreWork of replacement of old polluted pipe line, old pump sets, lowering in tw hdpe pipe and interconnection of pipe line at various schemes sub div. sikrai mla constituency sikrai under district collector contingency 2025. nit no. 07/25-26
Work of replacement of old polluted pipe line, old pump sets, lowering in tw hdpe pipe and interconnection of pipe line at various schemes sub div. sikrai mla constituency sikrai under district collector contingency 2025. nit no. 07/25-26
Read moreof your Industry type