Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 2x18.00mtr Span R.C.C. Well Foundation And Approach Road On Chidkuri Link Road Under R.I.D.F. 29 In Financial Year 2023 24. (Vidhan Sabha Payagpur)
|
| Description |
Construction Of 2x18.00mtr Span R.C.C. Well Foundation And Approach Road On Chidkuri Link Road Under R.I.D.F. 29 In Financial Year 2023 24 (Vidhan Sabha Payagpur)
|
| Organisation | Chief Engineer Devipatan (Gonda) Zone PWD Gonda | State Govt. and UT |
| Tender Id | 2024_CEDPW_882077_1 |
|
Reference Number |
81/8 Kam/e_Tendering/2023-24 Dated 08-01-2024 |
| Tender Fee | 2715 |
| EMD | 14.7 Lakh |
| Tender Value | |
| Place | Bahraich |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1508173 |
| Start Date | January 19, 2024 17:30 |
| End Date |
Expired
29/01/2024
Expired 889 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of a drain and road in saurabh nagar located on gram dahtaura road, extending from shri munesh salon to shri vijay kumar pandits house.
Construction of a drain and road in saurabh nagar located on gram dahtaura road, extending from shri munesh salon to shri vijay kumar pandits house.
Read moreConstruction of cement concrete (cc) road on the damaged bituminous stretch of sachivalaya road near the djb filling station, under sub-division-3 of division c and nd-roads (m-413), new delhi, during 2026-27.
Construction of cement concrete (cc) road on the damaged bituminous stretch of sachivalaya road near the djb filling station, under sub-division-3 of division c and nd-roads (m-413), new delhi, during 2026-27.
Read moreConstruction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Construction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Read moreProvn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Provn of chain link fence from cbp no 22 to cbp no 23, provn of main gate near cp-12 and spl repair to roof treatment in bldg no p-1 (mall road) under ge (west) jrc
Read moreP and l of hmp ready mix bc 40 mm consolidated incl cleaning of road surface, applying tack coat and correction works with dbm 50 mm incl road marking for resurfacing wks on z-k-l road under 55 rcc/ 762 brtf project vijayak in ladakh region
P and l of hmp ready mix bc 40 mm consolidated incl cleaning of road surface, applying tack coat and correction works with dbm 50 mm incl road marking for resurfacing wks on z-k-l road under 55 rcc/ 762 brtf project vijayak in ladakh region
Read moreConstruction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of murawanpurwa link road in km.-1 and 2(400) under r.i.d.f.-29 (nabard vitt poshit) yojna in financial year 2023-24 (vidhan sabha- payagpur)
Construction of murawanpurwa link road in km.-1 and 2(400) under r.i.d.f.-29 (nabard vitt poshit) yojna in financial year 2023-24 (vidhan sabha- payagpur)
Read moreConstruction of badkagaon link road in km.-1 and 2(500) under r.i.d.f.-29 (nabard vitt poshit) yojna in financial year 2023-24 (vidhan sabha- payagpur)
Construction of badkagaon link road in km.-1 and 2(500) under r.i.d.f.-29 (nabard vitt poshit) yojna in financial year 2023-24 (vidhan sabha- payagpur)
Read moreof your Industry type