Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
💻 Procurement Opportunity: Lenovo Server And Storage Hardware 💾 The Council Of Scientific And Industrial Research (Csir) Invites Bids For The Continuous Availability Maintenance And Care (Camc) Of Lenovo Server And Storage Hardware At Csir Igib, Delhi. 🛠️ 📅 Bid Submission Deadline: April 8, 2024, 11:00 Am Interested Vendors Should Provide Detailed Proposals, Including Maintenance Plans, Service Level Agreements, And Competitive Pricing. This Procurement Is Aimed At Ensuring The Continuous And Reliable Operation Of Critical It Infrastructure. Keywords: Camc, Lenovo Server And Storage Hardware, It Infrastructure, Csir, Council Of Scientific And Industrial Research, Public Sector Undertaking, Procurement, Maintenance Services| Particulars | Details |
|---|---|
| Title |
Camc Of Lenovo Server And Storage Hardware
|
| Description |
Camc Of Lenovo Server And Storage Hardware
|
| Organisation | Council of Scientific and Industrial Research | Public Sector Undertakings |
| Tender Id | 2024_CSIR_183137_1 |
|
Reference Number |
IGIB/7-5/340/23-24(1588) |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | CSIR-IGIB, Mall Road, Delhi |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=210212 |
| Start Date | March 19, 2024 22:00 |
| End Date |
Expired
08/04/2024
Expired 917 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Camc work of lift at govt. mahila hospital ajmer
Camc work of lift at govt. mahila hospital ajmer
Read moreCamc work of airconditioners at govt. mahila hospital ajmer
Camc work of airconditioners at govt. mahila hospital ajmer
Read moreConstruction of r.c.c. drain from house of triyogi barnwal to ashok barnwal (hardware dukan) in ward no. 23.
Construction of r.c.c. drain from house of triyogi barnwal to ashok barnwal (hardware dukan) in ward no. 23.
Read moreDesign, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Read moreCommissioner esd (meeseva) - establishment of aadhaar centers of in-house model - supply and installation of it hardware (aadhaar kits) items - phase-ii
Commissioner esd (meeseva) - establishment of aadhaar centers of in-house model - supply and installation of it hardware (aadhaar kits) items - phase-ii
Read moreRepair, testing and commencing of liquid storage carbon dioxide 30kl tanker at pvk5inc, kothagudem are
Repair, testing and commencing of liquid storage carbon dioxide 30kl tanker at pvk5inc, kothagudem are
Read moreKtps vii stage- adm-it- telecom-comprehensive annual maintenance contract(camc) charges for progility make epabx from the date of issue of po to 31.03.2027
Ktps vii stage- adm-it- telecom-comprehensive annual maintenance contract(camc) charges for progility make epabx from the date of issue of po to 31.03.2027
Read moreSupply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Supply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Read moreof your Industry type