Tender Details

Particulars Details
Title
Construction Of Major Bridge On Msh 15 To Bholi Bawada Khandala Bhosalewadi Padali Koparde To Sh 117 Road Mdr 116, Km 5/200 (Bawada) Tal Khandala, Dist Satara
Description
Construction Of Major Bridge On Msh 15 To Bholi Bawada Khandala Bhosalewadi Padali Koparde To Sh 117 Road Mdr 116, Km 5/200 (Bawada) Tal Khandala, Dist Satara
Organisation Public Works Region-Pune | State Govt. and UT
Tender Id 2024_PWDRP_1091181_1
Reference
Number
SHORT TERM E-TENDER NOTICE NO. 30/12 FOR 2024-2025
Tender Fee 2860
EMD 1.83 Lakh
Tender Value
Place Tal-Khandala, Dist-Satara
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1904342
Start Date September 24, 2024 14:30
End Date

01/10/2024 ( Expired 251 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road

Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Read more
Sopd_g_24_25_42 construction of road cum embankment on left bank of dikrong river (nh-15 at bahanibari to sissapathar bridge approach) (part -3. from ch. 15140.00 to 18400.00m) including approach roads under sopd-g for the year 2024-25

Sopd_g_24_25_42 construction of road cum embankment on left bank of dikrong river (nh-15 at bahanibari to sissapathar bridge approach) (part -3. from ch. 15140.00 to 18400.00m) including approach roads under sopd-g for the year 2024-25

Read more
Construction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124

Construction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124

Read more
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall

Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Improvement and widening of peth torangan harsul waghera amboli trimbakeshwar pahine devgaon ghoti road sh-23 km. 102/00 to 184/400 tal. trimbakeshwar dist- nashik

Improvement and widening of peth torangan harsul waghera amboli trimbakeshwar pahine devgaon ghoti road sh-23 km. 102/00 to 184/400 tal. trimbakeshwar dist- nashik

Read more
Construction of permanent bridge over dhalai river on santirbazar to chankap road at ch. 0.350 km. (job no. tp/com/216/2024-25)

Construction of permanent bridge over dhalai river on santirbazar to chankap road at ch. 0.350 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise