Tender Details
Particulars | Details |
---|---|
Title |
Mand R To Chikhaldara Water Supply Scheme. Maintenance Of Mbr And Esr And Water Supply Of The Villages And Billing, Recovery In Chikhaldara Urban Zone
|
Description |
Mand R To Chikhaldara Water Supply Scheme. Maintenance Of Mbr And Esr And Water Supply Of The Villages And Billing, Recovery In Chikhaldara Urban Zone
|
Organisation | Government of Maharashtra |
Tender Id | 2023_COJAL_953449_1 |
Reference Number |
e_Tender Notice No. 45 of 2023-2024 |
Tender Fee | 4720 |
EMD | 25600 |
Tender Value | |
Place | THE S. E. MJP CIRCLE AMRAVATI |
Link | https://mahatenders.gov.in |
Start Date | October 20, 2023 17:30 |
End Date |
30/10/2023 ( Expired 566 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreSitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Sitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Read moreDevelopment, operation and maintenance of ropeway between tawang monastery to p t tso lake in tawang district in the state of arunachal pradesh on hybrid annuity mode.
Development, operation and maintenance of
 ropeway between tawang monastery to p t
 tso lake in tawang district in the state of
 arunachal pradesh on hybrid annuity mode.
Read moreEngagement of project management consultancy services to provide 24x7 water supply and drink from tap to pilot area at indore municipal corporation areas.
Engagement of project management consultancy services to provide 24x7 water supply and drink from tap to pilot area at indore municipal corporation areas.
Read moreIndependent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Independent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Read moreDnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Dnit for prov tap conn to consumers ext aug and regabilitation of water supply system installation of 05 nos nnew tube wells const of new ohsr 0 50 lg and repair of existing tube wells and pump chamber at gurdaspur distt gurdaspur under amrut 2 0
Read moreOperation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Operation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Read moreOperation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Operation and maintenance of four laning stretch of nh 709b from epe crossing design ch. 0.000 to the of shamli bypass design ch. 61.409 on performance based maintenance contract mode in the state of uttar pradesh
Read moreO and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.
O and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.
Read moreRfp for protective treatment works of landslide zone in varandh ghat section in km 90.180 to 90.260 and km 94.150 to 96.600 on nh-965 dd in raigad district in the state of maharashtra
Rfp for protective treatment works of landslide zone in varandh ghat section in km 90.180 to 90.260 and km 94.150 to 96.600 on nh-965 dd in raigad district in the state of maharashtra
Read moreof your Industry type