Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Cover Drain With Soak Pit From Anil Naskar Land To Sambhu Bar Land
|
| Description |
Construction Of Cover Drain With Soak Pit From Anil Naskar Land To Sambhu Bar Land
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2024_ZPHD_659258_1 |
|
Reference Number |
92/RGP/24 SL 10 |
| Tender Fee | 500 |
| EMD | 7000 |
| Tender Value | |
| Place | SANSAD IV RASAPUNJA |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1427166 |
| Start Date | February 03, 2024 16:45 |
| End Date |
Expired
12/02/2024
Expired 892 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of cover drain with soak pit from sambhu bar land to khadar danga
Construction of cover drain with soak pit from sambhu bar land to khadar danga
Read moreConstruction of cover drain with soak pit from bappa naskar house to sambhu naskar house
Construction of cover drain with soak pit from bappa naskar house to sambhu naskar house
Read moreConstruction of cover drain with soak pit from khadar danga to gopal naskar land
Construction of cover drain with soak pit from khadar danga to gopal naskar land
Read moreCc cover drain from the sambhu naskar house to tapas naskar land 67019498
Cc cover drain from the sambhu naskar house to tapas naskar land 67019498
Read moreConstruction of cover drain with soak pit from tapan naskar house to sisir naskar house
Construction of cover drain with soak pit from tapan naskar house to sisir naskar house
Read moreConstruction of cover drain with soak pit from bhaben naskar house to bappa naskar house
Construction of cover drain with soak pit from bhaben naskar house to bappa naskar house
Read moreof your Industry type