Tender Details
Particulars | Details |
---|---|
Title |
Repairing/ Changing Of Feed Chute, Sieve Bend Holding Structure And Sieve Bend Discharge Chute Of Washed Coal Screen Unit 607 1 To 607 4 Of 18 M Floor Of Washery Building At Moonidih Coal Washery.
|
Description |
Repairing/ Changing Of Feed Chute, Sieve Bend Holding Structure And Sieve Bend Discharge Chute Of Washed Coal Screen Unit 607 1 To 607 4 Of 18 M Floor Of Washery Building At Moonidih Coal Washery.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_333087_1 |
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2024-25/E 1853 |
Tender Fee | 0 |
EMD | 5400 |
Tender Value | |
Place | MOONIDIH WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345291 |
Start Date | March 22, 2025 14:30 |
End Date |
25/03/2025 ( Expired 47 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of gear box for 8.5 e 9 coal mill installed at unit no 1 to 4 of phi and ii sgtps mppgcl birsinghpur
Procurement of gear box for 8.5 e 9 coal mill installed at unit no 1 to 4 of phi and ii sgtps mppgcl birsinghpur
Read moreProposed modernization of 2nd floor part gf of branch office building at amritsar for shifting bo 150 unit 4 and so clia from existing rented premises
Proposed modernization of 2nd floor part gf of branch office building at amritsar for shifting bo 150 unit 4 and so clia from existing rented premises
Read moreProcurement of spares of falcon make oil gun assembly for unit no. 1 to 4, ph-i and ii, at sgtps, mppgcl, birsinghpur.
Procurement of spares of falcon make oil gun assembly for unit no. 1 to 4, ph-i and ii, at sgtps, mppgcl, birsinghpur.
Read moreCarriage of spillaged coal from the raw coal section by manual labor including loading unloading and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Carriage of spillaged coal from the raw coal section by manual labor including loading unloading 
 and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Read moreRepairing and painting of hydroveyor structure during overhauling of unit-4 at ktps
Repairing and painting of hydroveyor structure during overhauling of unit-4 at ktps
Read moreProposed renovation of toilets, replacement of windows and other misc. works at 2nd floor gf of bo building amritsar pb for making it ready for shifting bo-150 unit 4 so clia from existing rented premises
Proposed renovation of toilets, replacement of windows and other misc. works at 2nd floor gf of bo building amritsar pb for making it ready for shifting bo-150 unit 4 so clia from existing rented premises
Read moreProviding and making three phase and single phase power outlet points and other associated works at ground to 3rd floor of esb 1 related to facilitate building with central ac system
Providing and making three phase and single phase power outlet points and other associated works at ground to 3rd floor of esb 1 related to facilitate building with central ac system
Read moreWork contract for hammering of coal bunker chutes raw coal feeder of unit no 1 to 4 ph i ii for the period of 2 months rainy season at sgtps mppgcl birsinghpur
Work contract for hammering of coal bunker chutes raw coal feeder of unit no 1 to 4 ph i ii for the period of 2 months rainy season at sgtps mppgcl birsinghpur
Read moreProviding and fixing of 18 nos. split type air conditioners of 2.0 tr/ 1.5 tr/1.0 tr capacity in integrated public health lab (iphl) 2nd floor, room no.1 to 18, sarai building at gmsh, sector-16, chandigarh.
Providing and fixing of 18 nos. split type air conditioners of 2.0 tr/ 1.5 tr/1.0 tr capacity in integrated public health lab (iphl) 2nd floor, room no.1 to 18, sarai building at gmsh, sector-16, chandigarh.
Read moreRepairing and recondtioning of inter cooler and after cooler of kpcl make air compressor installed at unit 1 to 5 stps suratgarh
Repairing and recondtioning of inter cooler and after cooler of kpcl make air compressor installed at unit 1 to 5 stps suratgarh
Read moreof your Industry type