Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Soil And Water Conservation Works At Vettathukadavilthodu Side Protection At Arattupuzha Panchayat In Muthukulam Division Project No 747 25 Of Alappuzha District Panchayat
|
| Description |
Retaining Wall 1.5m Ht 86 Rm
|
| Organisation | Directorate of Soil Survey and Soil conservation | State Govt. and UT |
| Tender Id | 2025_DSSC_735309_1 |
|
Reference Number |
DSCO/ALP/274/2024-C4 |
| Tender Fee | 1550 |
| EMD | 17574 |
| Tender Value | - |
| Place | Arattupuzha Grama Panchayat |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1177638 |
| Start Date | February 07, 2025 22:30 |
| End Date |
Expired
15/02/2025
Expired 609 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Soil and water conservation works in distt roopnagar
Construction of stone masonry structures crate wire structures in village tibba tapriyan dhamana sub divsion nurpurbedi sri anandpur sahib
Read moreSoil and water conservation works in distt roopnagar
Construction of stone masonry structure retaining wall and crate wire structures village khatana and jatwahar under sub divsion nurpurbedi,distt ropar
Read moreConstruction of protection work for the agriculture land damaged due to soil erosion and slide on garore nallah at village chak jagtu tehsil bishnah jammu
Construction of protection work for the agriculture land damaged due to soil erosion and slide on garore nallah at village chak jagtu tehsil bishnah jammu
Read morePlinth protection including drain around the new office and wall and earthwork (soil filling) on the forest route behind the gate in ward no. 14 sohardr nagar.
Plinth protection including drain around the new office and wall and earthwork (soil filling) on the forest route behind the gate in ward no. 14 sohardr nagar.
Read moreContretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran
Contretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran
Read moreSoil exploration for the work improvement to dc from talanga minor to thurda minor via talanga, rahanja nallah baghamara nallah (link drain of sunamuhi nallah) and construction of 5 nos farm land bridges and protection wall in salandi-mantei doab no
Soil exploration work
Read moreSlope stabilisation and soil protection works at km 34.05 (teitrung bridge), km 27.900 (shonsho bridge), km 33.250 (mayung bridge) and km 84.575 (mokaha bridge) on road tuensang-mon under 100 rcc/ 15brtf (p) sewak in nagaland state under epc mode
Slope stabilisation and soil protection works at km 34.05 (teitrung bridge), km 27.900 (shonsho bridge), km 33.250 (mayung bridge) and km 84.575 (mokaha bridge) on road tuensang-mon under 100 rcc/ 15brtf (p) sewak in nagaland state under epc mode
Read moreDetail of sub-soil investigation for the work improvement to dc from motelchhaka to dholi nallah and its link drains, construction of 6 nos farm land bridges and protection walls near chandigaon check dam over dholi nallah in salandi-mantei doab no x
Soil exploration work
Read moreRfp (request for proposal) for design and construction of major bridges (28 no s) with substructure, super structure, formation on approaches of 50 m on either side of the bridges and other connected protection works including surveying, soil and other connected parameters investigations, testing and commissioning the bridges in connection with doubling of chikjajur-rayadurg-ballari section of mysore and hubballi divisions in south western railway on epc mode.
Rfp (request for proposal) for design and construction of major bridges (28 no s) with substructure, super structure, formation on approaches of 50 m on either side of the bridges and other connected protection works including surveying, soil and other connected parameters investigations, testing and commissioning the bridges in connection with doubling of chikjajur-rayadurg-ballari section of mysore and hubballi divisions in south western railway on epc mode.
Read moreof your Industry type