Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Repairing/Rewinding Of 05 Nos. 3 Phase Induction Motors, (6.6 Kv/3.3 Kv, Make Bhel, 250 Kw), (6.6 Kv, Make Ngef, 370 Kw), (6.6 Kv, Make Gec, 450 Kw), (6.6 Kv, Make Marathon, 900 Kw) And (6.6 Kv, Make Marathon, 900 Kw) For Pumps At Dep.
|
| Description |
Complete Repairing/Rewinding Of 05 Nos. 3 Phase Induction Motors, (6.6 Kv/3.3 Kv, Make Bhel, 250 Kw), (6.6 Kv, Make Ngef, 370 Kw), (6.6 Kv, Make Gec, 450 Kw), (6.6 Kv, Make Marathon, 900 Kw) And (6.6 Kv, Make Marathon, 900 Kw) For Pumps At Dep.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_SECL_294846_1 |
|
Reference Number |
SECL/GM/DA/SO(EnM)/ e-tender/23-24/36 dtd-29/11/23 |
| Tender Fee | - |
| EMD | 13900 |
| Tender Value | - |
| Place | Office of the Staff Officer (EnM), Dipka Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | December 01, 2023 15:30 |
| End Date |
Expired
12/12/2023
Expired 1038 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing, rewinding of conveyor drive induction ht motors (250 kw, 6.6 kv and 200 kw, 6.6 kv) of chp under dudhichua project
Repairing, rewinding of conveyor drive induction ht motors (250 kw, 6.6 kv and 200 kw, 6.6 kv) of chp under dudhichua project
Read moreProcurement of 02 nos. 6.6 kv 988 kw ,992 rpm,id fan motor and 01 no. 6.6kv, 775 kw, 992 rpm fd fan motor for unit 1 and 2 ph-i sgtps birsinghpur.
Procurement of 02 nos. 6.6 kv 988 kw ,992 rpm,id fan motor and 01 no. 6.6kv, 775 kw, 992 rpm fd fan motor for unit 1 and 2 ph-i sgtps birsinghpur.
Read moreComplete repairing/rewinding of 3 phase marathon make induction motor, 6.6 kv, 750 kw, 1492 rpm, sl. no. 3f660895/2 failed during operation in the deep mine pumping zone of rajmahal ocp.
Complete repairing/rewinding of 3 phase marathon make induction motor, 6.6 kv, 750 kw, 1492 rpm, sl. no. 3f660895/2 failed during operation in the deep mine pumping zone of rajmahal ocp.
Read moreRepairing and rewinding of 3.3 kv 400 kw squirrel cage induction motor, marathon make,sl no 3f330524-5
Repairing and rewinding of 3.3 kv 400 kw squirrel cage induction motor, marathon make,sl no 3f330524-5
Read moreRepairing, overhauling of ps-8 and loading section 02 mva transformer make - ngef, 6.6 kv to 433v at madhuban coal washery under block-ii area, bccl.
Repairing, overhauling of ps-8 and loading section 02 mva transformer make - ngef, 6.6 kv to 433v at madhuban coal washery under block-ii area, bccl.
Read more470 kw/6 pole, 6.6 kv, 3 phase, frequency level (50 hz) , cooling method: tefc, dol start ht motor of
470 kw/6 pole, 6.6 kv, 3 phase, frequency level (50 hz) , cooling method: tefc, dol start ht motor of
Read moreRepairs to 850 kw, 3.3 kv, ht motor of marathon make bearing sr. no up 182109/1 at 160 mld salauli water works.
Repairs to 850 kw, 3.3 kv, ht motor of marathon make bearing sr. no up 182109/1 at 160 mld salauli water works.
Read moreComplete rewinding of 700 kw 6.6 kv ht motor complete set rpm make bhel si no 1185a401 11 02 under abocp block ii area.
Complete rewinding of 700 kw 6.6 kv ht motor complete set rpm make bhel si no 1185a401 11 02 under abocp block ii area.
Read moreRepairing and rewinding of 150 kw, 6.6 kv, 3ph induction motor (sl. no. 314021801) installed at conveyor 2.1 of krishnashila chp at krishnashila project.
Repairing and rewinding of 150 kw, 6.6 kv, 3ph induction motor (sl. no. 314021801) installed at conveyor 2.1 of krishnashila chp at krishnashila project.
Read moreInstallation, testing and commissioning of interlocking system of 33kv and 6.6kv breakers with respective gang operated air break switches (33kv and 6.6 kv isolators) installed at coal and ob substation of khadia project
Installation, testing and commissioning of interlocking system of 33kv and 6.6kv breakers with respective gang operated air break switches (33kv and 6.6 kv isolators) installed at coal and ob substation of khadia project
Read moreof your Industry type