Tender Details

Particulars Details
Title
Flood Risk Mitigation Along 3 L Band Of Satluj River From
Description
Flood Risk Mitigation Along 3 L Band Of Satluj River From &Amp#X0d Upstream Of Rd 41000 Near Villages Of Fassa And Sarangpur &Amp#X0d Distt Ropar
Organisation Department of Water Resources | State Govt. and UT
Tender Id 2025_WR_141419_1
Reference
Number
5843
Tender Fee 5900
EMD 3.14 Lakh
Tender Value
Place Ropar
Link https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=286646
Start Date May 28, 2025 23:05
End Date

19/06/2025 ( Expired 4 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di

Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di

Read more
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Read more
Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)

Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)

Read more
Consultancy services for independent engineer during onm of 4laning from km 0.000 to km 26.400 along with 0.700km approach towards nh207 with interchange on nh4 at point) of bangalore to malur section pkg1 from km 26.400 to km 53.500 of malur t

Consultancy services for independent engineer during onm of 4laning from km 0.000 to km 26.400 along with 0.700km approach towards nh207 with interchange on nh4 at point) of bangalore to malur section pkg1 from km 26.400 to km 53.500 of malur t

Read more
Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.

Rehabilitation and upgradation to 2 4 lane with paved shoulders from km 79.300 to km 87.360 and km 88.437 to km 93.819 of nh 167k bridge approaches of iconic bridge across river krishna in the state of telangana and andhra pradesh on epc basis.

Read more
Installation of streetlight along the nh 12 (dalkhola bypass) from km. 447.640 to km. 452.140 in the state of west bengal

Installation of streetlight along the nh 12 (dalkhola bypass) from km. 447.640 to km. 452.140 in the state of west bengal

Read more
Construction of straight-cut flood escape channel from south buckingham canal near okkiyam maduvu to sea in chennai district for flood relief to fringe areas around pallikaranai swamp.

Construction of straight-cut flood escape channel from south buckingham canal near okkiyam maduvu to sea in chennai district for flood relief to fringe areas around pallikaranai swamp.

Read more
Engagement of buses along with driver from private operators on hire basis for crowd clearance during weekend, festival days, full moon days,new moon days etc.. by tnstc(kum)ltd.,kumbakonam

Engagement of buses along with driver from private operators on hire basis for crowd clearance during weekend, festival days, full moon days,new moon days etc.. by tnstc(kum)ltd.,kumbakonam

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise