Tender Details
Particulars | Details |
---|---|
Title |
Nida Project Of Thaliparamba Legislative Assembly C Onstituencyin Kannur Edakkom Micro Watersehd Phase Ii
|
Description |
Vented Cross Bar Whs Spring Water Collection Tank Concrete Check Dams Laterite Checkdams Cross Bunds Retaining Wall
|
Organisation | Directorate of Soil Survey and Soil conservation | State Govt. and UT |
Tender Id | 2024_DSSC_676108_1 |
Reference Number |
SSSC/1377/2024-PG(4)/NIDA |
Tender Fee | 5515 |
EMD | 50000 |
Tender Value | |
Place | ChapparapadavuPanchayat Ward 16,17,18 |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1051322 |
Start Date | June 14, 2024 23:30 |
End Date |
25/06/2024 ( Expired 342 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreProvn of md accn (phase-ii of two phases) at missamari under ge missamari
Provn of md accn (phase-ii of two phases) at missamari under ge missamari
Read more765kv ais new substation package ss 120t for establishment of 765/400 kv cn halli station associated with transmission system for integration of ananthapuram-ii rez - phase-ii (3 gw) through tbcb route
765kv ais new substation package ss 120t for establishment of 765/400 kv cn halli station associated with transmission system for integration of ananthapuram-ii rez - phase-ii (3 gw) through tbcb route
Read moreReplacement of oh electric cable by ug cable and connected works at si lines and dronachal in bhopal phase-ii of ii phases under ge dronachal
Replacement of oh electric cable by ug cable and connected works at si lines and dronachal in bhopal phase-ii of ii phases under ge dronachal
Read moreKbc-06 construction of entry and exit buildings of palarivattom junction, alinchuvadu, chembumukku, vazhakkala and padamughal of phase ii of kochi metro rail project excluding architectural and building service works
Kbc-06 construction of entry and exit buildings of palarivattom junction, alinchuvadu, chembumukku, vazhakkala and padamughal of phase ii of kochi metro rail project excluding architectural and building service works
Read moreUnder state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Under state scheme (chief minister road connectivity scheme) extension of math lamkoti motor road from km 2 to 5 in purola development block of purola assembly constituency of uttarkashi distt (stage-2, iind phase) (including maintenance of 3 year)
Read moreRecaning of chairs and repair, replacement of certain parts of chairs, tables, table top, sofa cushions and covers at all units and md otm accns including map phase i and ii under ge belgaum
Recaning of chairs and repair, replacement of certain parts of chairs, tables, table top, sofa cushions and covers at all units and md otm accns including map phase i and ii under ge belgaum
Read moreProcurement of furniture for 94 dus sailors married accomodation as part of infrastructure augmentation at ina, ezhimala nap phase-ii
As per boq and tender documents
Read moreRenovation overhaul of electrical installations in the committee hall no 1 of the tripura legislative assembly capital complex agartala tripura west
Renovation overhaul of electrical installations in the committee hall no 1 of the tripura legislative assembly capital complex agartala tripura west
Read moreof your Industry type