Tender Details
Particulars | Details |
---|---|
Title |
Phed/Ee/Bwd/E Nit 13/Sl05/23 24
|
Description |
Khandra Pws Scheme With Sinking Of Tube Well, Lds, Rising Main,Fhtc, Construction Of 400 Cum Capacity Rcc Ohr With 20.0 Mtr.Staging Height Including ........... At Different Tw Site Under Monteswar Block,District Purba Bardhaman.New Scheme.3 Rd Call
|
Organisation | Government of West Bengal |
Tender Id | 2023_PHED_541628_5 |
Reference Number |
WBPHED/EE/BWD/eNIT-13/2023-24 |
Tender Fee | |
EMD | 11.32 Lakh |
Tender Value | |
Place | Purto Bhavan 2nd FL. Sadarghat, Purba Bardhaman. |
Link | https://wbtenders.gov.in |
Start Date | June 12, 2023 20:00 |
End Date |
04/07/2023 ( Expired 677 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sinking of 1 no. 400.00 mtr. deep 100 x 50 mm. dia. trial-cum-production tube well fitted with indian mark - ii pump with pvc pipe and strainers at t/w site-2 for jeliakhali purbakhanda w/s scheme, sdk-ii block under hasnabad sub-divn, p.h.e. dte
Sinking of 1 no. 400.00 mtr. deep 100 x 50 mm. dia. trial-cum-production tube well fitted with indian mark - ii pump with pvc pipe and strainers at t/w site-2 for jeliakhali purbakhanda w/s scheme, sdk-ii block under hasnabad sub-divn, p.h.e. dte
Read moreGeo-technical investigation, design (only sub-structure i.e. foundation part)and construction of rcc elevated ohr(intze type) of capacity 400 cum of staging height 20 meter with pile foundation..at zone-i in ward no. 04, gobardanga municipality
Geo-technical investigation, design (only sub-structure i.e. foundation part)and construction of rcc elevated ohr(intze type) of capacity 400 cum of staging height 20 meter with pile foundation..at zone-i in ward no. 04, gobardanga municipality
Read moreGeo-technical investigation, design (only sub-structure i.e. foundation part) and construction of rcc elevated ohr (intze type) of capacity 400 cum of staging height 20 meter with pilefoundation includ.pipe connection..zone-i, gobardanga municipality
Geo-technical investigation, design (only sub-structure i.e. foundation part) and construction of rcc elevated ohr (intze type) of capacity 400 cum of staging height 20 meter with pilefoundation includ.pipe connection..zone-i, gobardanga municipality
Read moreWbphed/ee/bwd/enit-44/2023-24
Augmentation of rayan (part-ii) pws scheme with sinking of tube-well, lds, rising main,fhtc,construction of 500 cum capacity rcc ohr with 20.0 mtr. with staging height .......... at different tw site under burdwan -i block, district-purba-bardhaman.
Read moreConstruction of solar based rcc mini water supply scheme of capacity 8000 liter water tank with hydt and rising distribution pipeline at bhanwarpahar tourist place of nawatoli panchayat of block kolebira district simdega under dwsd simdega (3rd call)
Construction of solar based rcc mini water supply scheme of capacity 8000 liter water tank with hydt and rising distribution pipeline at bhanwarpahar tourist place of nawatoli panchayat of block kolebira district simdega under dwsd simdega (3rd call)
Read moreRising main with laying of 150 mm dia di(k-9) from 4th tube well site to ohr site for kumirda water supply scheme
Rising main with laying of 150 mm dia di(k-9) from 4th tube well site to ohr site for kumirda water supply scheme
Read moreSinking of tube well construction of different capacity rcc over head reservoir over pile raft foundation including sub soil investigation works for construction of over head reservoir with laying distribution system pump house providi
Sinking of tube well construction of 
 different capacity rcc over head 
 reservoir over pile raft foundation 
 including sub soil investigation works for 
 construction of over head reservoir 
 with laying distribution system pump 
 house providi
Read moreSinking of tube well laying distribution pipe line rising main pump house, boundary wall soil investigation construction of 100 cum ohr intze type with solid raft accommodate fhtc 722 nos including two years om under jjm with allied work
Sinking of tube well laying distribution pipe line rising main pump house, boundary wall soil investigation construction of 100 cum ohr intze type with solid raft accommodate fhtc 722 nos including two years om under jjm with allied work
Read morePhed/ee/bwd/enit-36/sl04/23-24
Augmentation of rayan (part-ii) piped water supply scheme with sinking of tube-well, lds,rising main,fhtc, constn. of 500 cum capacity rcc ohr with 20.0 mtr. staging height .......... at different tw site under burdwan-i block, dist.-purba-bardhaman.
Read morePhed/ee/bwd/enit-36/sl07/23-24
Bakalsa p.w.s scheme with sinking of tube-well, lds,rising main,fhtc, constn. of switch rooms and b.walls with gates and land development,drain and internal pathway at different tw site under ketugram -i block, district- purba-bardhaman. new scheme.
Read moreof your Industry type