Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Flue Gas Duct Deflector Plates Of Various Models
|
| Description |
Supply Of Flue Gas Duct Deflector Plates Of Various Models 6 Items
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_530497_1 |
|
Reference Number |
CE/MTPS-1/MM/AEE2/OT608/24-25 |
| Tender Fee | 0 |
| EMD | 8190 |
| Tender Value | - |
| Place | MTPS I |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631565 |
| Start Date | March 06, 2025 22:50 |
| End Date |
Expired
24/03/2025
Expired 566 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply and fixing of circuit plates,number plates,phase plates,danger boards and anti climbing devices in 132kv minpur-jogipet,132kv minpur-wattipally and 132kv wattipally-jogipet lines in onm division,narsapur.
Supply and fixing of circuit plates,number plates,phase plates,danger boards and anti climbing devices in 132kv minpur-jogipet,132kv minpur-wattipally and 132kv wattipally-jogipet lines in onm division,narsapur.
Read moreContract for repair, replacement and restoration of 6.6 kv 1ba bus duct
Contract for repair, replacement and restoration of 6.6 kv 1ba bus ductof unit-1, vstps
Read moreSupply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Supply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Read moreSupply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreCarrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Read moreflue gas duct deflector plates of various models
flue gas duct deflector plates of various models
Read moreFlue gas duct deflector plates of various models
Flue gas duct deflector plates of various models -6 items
Read moreProcurement of flue gas duct deflector plates of various models 06 items
Procurement of flue gas duct deflector plates of various models 06 items
Read moreof your Industry type