Tender Details
Particulars | Details |
---|---|
Title |
Estimate For Internal Clearance Of Outfall Link Drain From Rd 2800 To 0 Before Flood Season 2025
|
Description |
Estimate For Internal Clearance Of Outfall Link Drain From Rd 2800 To 0 Before Flood Season 2025 (The Tender Is Open For Contractors/Agencies/Societies)
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1680 |
EMD | 4980 |
Tender Value | |
Place | NAGGAL |
Link |
AAAAAAAAAA Login to view |
Start Date | April 18, 2025 22:30 |
End Date |
25/04/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Performance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreSs of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Read moreShort term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read morePerformance based maintenance contract (pbmc) estimate from km. 59/000 to 59/921 , 0/000 to 1/600 (temple link) of nh- 316 badadanda, puri and from km. 59/921 to 90/200 (puri-konark link) and from km. 0/000 to 28/500 (puri-satapada link) in odisha
Performance based maintenance contract (pbmc) estimate from km. 59/000 to 59/921 , 0/000 to 1/600 (temple link) of nh- 316 badadanda, puri and from km. 59/921 to 90/200 (puri-konark link) and from km. 0/000 to 28/500 (puri-satapada link) in odisha
Read moreContract for freight forwarding on consolidation basis and customs clearance of imported
Contract for freight forwarding on consolidation basis and customs clearance of imported
 consignments from various ries up to neeri, nagpur (india) its five zonal centres located at
 mumbai, delhi, channai, kolkata hyderabad
Read morePlc of 200 mm crmb 60 mm dbm and 40 mm bc incl cleaning of road surface and applying pc comma tc and rd marking for surf wks bet km 0 to km 7 net length 7 km on pt 4840 high ground bl rd under 108 rcc 759 brtf of project deepak in hp
Plc of 200 mm crmb 60 mm dbm and 40 mm bc incl cleaning of road surface and applying pc comma tc and rd marking for surf wks bet km 0 to km 7 net length 7 km on pt 4840 high ground bl rd under 108 rcc 759 brtf of project deepak in hp
Read moreRepair/ renovation/ extension/ maintenance of field channel/ drains at work site gaggarwal to happat lab phase-1st in village bamnoo for a length of 200 mts. from rd 00-200 -- project sangarwani -- estimated cost rs. 636700 --
Repair/ renovation/ extension/ maintenance of field channel/ drains at work site gaggarwal to happat lab phase-1st in village bamnoo for a length of 200 mts. from rd 00-200 -- project sangarwani -- estimated cost rs. 636700 --
Read moreShort term maintenance contract (stmc) estimate from km. 35.00 to km. 38.00, from km. 45.00 to 50.00 km. and from km. 60.00 to 65.00 of nh 326a in the state of odisha for the year 2024-25.
Short term maintenance contract (stmc) estimate from km. 35.00 to km. 38.00, from km. 45.00 to 50.00 km. and from km. 60.00 to 65.00 of nh 326a in the state of odisha for the year 2024-25.
Read moreof your Industry type