Tender Details

Particulars Details
Title
Repairing Work Of Approach Road To Dam, Vpd Cleaning Of Adit Gallery, Dewatering Of Stilling Basin And Construction Of Gauging Stairs For Chandrabhaga Medium Project. Tq.Achalpur Dist.Amravati
Description
Repairing Work Of Approach Road To Dam, Vpd Cleaning Of Adit Gallery, Dewatering Of Stilling Basin And Construction Of Gauging Stairs For Chandrabhaga Medium Project. Tq.Achalpur Dist.Amravati
Organisation CE-Water Resources Dept. Amravati | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 2860
EMD 2.66 Lakh
Tender Value
Place Achalpur
Link

AAAAAAAAAA

Login to view
Start Date April 08, 2025 15:30
End Date

22/04/2025 ( 0 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl

Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl

Read more
Wbphed/01/bwn of se/cc of 2025-26 sl.no.2

Balance work such as construction of approach road sinking of additional tube well construction of pump house land development and other allied work for different pwss under mangolkote block under katwa subdivn within burdwan divn phe dte.

Read more
Tender for construction of link road kothe sukhanand to siriyewala and in mc baghapurana, and sukhanand to mour nau abad,sukhanand mour road to cheeda assembly constituency baghapurana earth work to 1st coat premix work incd. construction o

Tender for construction of link road kothe sukhanand to siriyewala and in mc baghapurana, and sukhanand to mour nau abad,sukhanand mour road to cheeda assembly constituency baghapurana earth work to 1st coat premix work incd. construction o

Read more
Percentage bidding for construction of new retail outlet nro-chando at vill- chando, on nh-339, dist-mahoba, state-uttar pradesh (up)- 210427

Construction of new retail outlet, as per the proposed layout, involving of construction of new sales building, driveway, installation of tanks, stps, hoarding, entry/exit culvert as per nhai norms, hdpe pipeline work with installing of mpds, electrical work for connecting mpds, stps and octagonal poles light poles, construction of the pedestals as per the proposed layout and as per specifications / standard drawings, construction of approach as per nhai approval. the work pertains to kanpur territory in the state of u.p.

Read more
Design and cost estimation for construction of bridge at (rfp) construction work of a bridge to connect himmatpur with the construction of belpadav ratanpur motor road in kaladhungi constituency and distt nainital

Design and cost estimation for construction of bridge at (rfp) construction work of a bridge to connect himmatpur with the construction of belpadav ratanpur motor road in kaladhungi constituency and distt nainital

Read more
Construction of road and drain work (2.00 km) from sidcul to the project site for the construction residential project at anneki-hetampur in haridwar district under pradhan mantri awas yojana (urban). (chainage 3.550 to 5.250)

Construction of road and drain work (2.00 km) from sidcul to the project site for the construction residential project at anneki-hetampur in haridwar district under pradhan mantri awas yojana (urban). (chainage 3.550 to 5.250)

Read more
Metaling premix carpeting of approach road from steel truss bridge to nathpa dam via gate ventilation gallery with 05 year annual maintenance work at njhps nathpa dam distt kinnaur hp

Metaling premix carpeting of approach road from steel truss bridge to nathpa dam via gate ventilation gallery with 05 year annual maintenance work at njhps nathpa dam distt kinnaur hp

Read more
Laying of new pipe line for dwara, and akhandwali bhilang water supply scheme (including upstream and downstream side) due to construction of song dam of block raipur, district dehradun under deposit work

Laying of new pipe line for dwara, and akhandwali bhilang water supply scheme (including upstream and downstream side) due to construction of song dam of block raipur, district dehradun under deposit work

Read more
1)watering and maintaining the plants, lawns in front of control room, guest house along the peripheral road and approach road etc., at 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026 and 2) cleaning maintenance of control room ,ground floor office rooms, dg room, guest house, bath rooms, water closets and all drains etc., in the premises of 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026.

1)watering and maintaining the plants, lawns in front of control room, guest house along the peripheral road and approach road etc., at 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026 and 2) cleaning and maintenance of control room ,ground floor office rooms, dg room, guest house, bath rooms, water closets and all drains etc., in the premises of 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026.

Read more
Revamping of 1520.00 m long exisitng approach road ,construction of plinth, construction of dwarf boundary wall, plinth, rcc foundations to suit ch 10 outfit for any other location under naharkatia, mohamri and balimara area including supply of all materials except cement.

Revamping of 1520.00 m long exisitng approach road ,construction of plinth, construction of dwarf boundary wall, plinth, rcc foundations to suit ch 10 outfit for any other location under naharkatia, mohamri and balimara area including supply of all materials except cement.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise