Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Remodelling Of Culverts By Precast Rcc Box Culverts At Narwana Link Road No. 1, 2 And 3 Under Sub Division East Road Iv Of Division East Road/(M 212) During 2025 26.
|
| Description |
Remodelling Of Culverts By Precast Rcc Box Culverts At Narwana Link Road No. 1, 2 And 3 Under Sub Division East Road Iv Of Division East Road/(M 212) During 2025 26.
|
| Organisation | Public Works Department | State Govt. and UT |
| Tender Id | 2026_PWD_288107_1 |
|
Reference Number |
17/SE/EAST/CIRCLE/PWD/2025-26 (Recall) |
| Tender Fee | 0 |
| EMD | 7.89 Lakh |
| Tender Value | - |
| Place | East Road-IV |
| Link |
View Original Tender Notice
https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=382000 |
| Start Date | March 04, 2026 00:25 |
| End Date |
Expired
10/03/2026
Expired 222 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration of roads damaged by various agencies under sub- division east road-i, ii, iii and iv of division east road/(m-212), delhi during 2026-27
Restoration of roads damaged by various agencies under sub- division east road-i, ii, iii and iv of division east road/(m-212), delhi during 2026-27
Read moreRemodelling of existing storm water drain with rcc precast drains of inner roads of sector-16, rohini under sub division nwr-22, division nwr-2, during 2026-27.
Remodelling of existing storm water drain with rcc precast drains of inner roads of sector-16, rohini under sub division nwr-22, division nwr-2, during 2026-27.
Read moreTtps operation circle mpm ii unit iv and v mill gear box inspection complete overhauling and reassembling of gear box in unit iv and v hp 803 bowl mills during breakdown of gear box
Ttps operation circle mpm ii unit iv and v mill gear box inspection complete overhauling and reassembling of gear box in unit iv and v hp 803 bowl mills during breakdown of gear box
Read moreRemodelling of existing storm water drain with rcc precast drains of road no. b-3 and inner roads of sector-17, rohini under sub division nwr-22, division nwr-2, during 2026-27.
Remodelling of existing storm water drain with rcc precast drains of road no. b-3 and inner roads of sector-17, rohini under sub division nwr-22, division nwr-2, during 2026-27.
Read moreA/r and m/o to various roads under pwd east road division during 2026-27. (sh-providing, running and maintaining water sprinkler anti smog gun on hire basis at various locations of roads under sub-division east road-i, ii, iii and iv section-i andii)
A/r and m/o to various roads under pwd east road division during 2026-27. (sh-providing, running and maintaining water sprinkler anti smog gun on hire basis at various locations of roads under sub-division east road-i, ii, iii and iv section-i andii)
Read moreTtps es circle instn ii removal cleaning and refixing of instruments pertaining to east hp bypass system stator water and seal oil system during capital annual overhaul of unit iv for the year 2026 2027
Ttps es circle instn ii removal cleaning and refixing of instruments pertaining to east hp bypass system stator water and seal oil system during capital annual overhaul of unit iv for the year 2026 2027
Read moreErection of chain link fencing (1.85 kms) around peruru extn-iv (11.41 ha ca area) of bhuvanapally beat of cherukuru section of wazeedu range of venkatapuram division of mulugu district during the year 2026-27 (spillover of 2025-26)
Erection of chain link fencing (1.85 kms) around peruru extn-iv (11.41 ha ca area) of bhuvanapally beat of cherukuru section of wazeedu range of venkatapuram division of mulugu district during the year 2026-27 (spillover of 2025-26)
Read moreTtps mechii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of
Ttps mechii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of
Read moreRemodelling of culverts by precast rcc box culverts at narwana link road no. 1, 2 and 3 under sub-division east road-iv of division east road/(m-212) during 2025-26
Remodelling of culverts by precast rcc box culverts at narwana link road no. 1, 2 and 3 under sub-division east road-iv of division east road/(m-212) during 2025-26
Read moreRemodelling of storm water drain and culverts as per the new master drainage plan-2025, connecting narwana road drain to the major drain along nh-24 at narwana link road no. 1, link road-2 (big nallah) and link road-3, under sub-division east road-iv
Remodelling of storm water drain and culverts as per the new master drainage plan-2025, connecting narwana road drain to the major drain along nh-24 at narwana link road no. 1, link road-2 (big nallah) and link road-3, under sub-division east road-
Read moreof your Industry type