Tender Details

Particulars Details
Title
Variable Frequency Tan Delta Meter
Description
Organisation Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee
EMD
Tender Value
Place
Link

AAAAAAAAAA

Login to view
Start Date June 06, 2025 22:41
End Date

27/06/2025 ( 17 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information:
Buyer Details
Name: Pankaj Nigam
Address: Pankaj Nigam,[email protected],BHARAT HEAVY ELECTRICAL LTD, PIPLANI,Bhopal,MADHYA PRADESH,462022,India
Ministry: Ministry Of Heavy Industries And Public Enterprises
Department: Department Of Heavy Industry
Organisation: Bharat Heavy Electricals Limited (bhel)
Office Address: Hep Bhopal
Similar Tenders
Hardware of microwave receiver for atomic frequency standard development.

Hardware of microwave receiver for atomic frequency standard development.

Read more
Rfp for modification of qty-52 aslesha mk-i radars due to migration of frequency band

Rfp for modification of qty-52 aslesha mk-i radars due to migration of frequency band

Read more
Procurement of ash slurry density meter installed in silo area at ahp for imd-4, stps, sarni.

Procurement of ash slurry density meter installed in silo area at ahp for imd-4, stps, sarni.

Read more
Construction of buttress wall towards eastern side drain slope of 994 mb bench 50 meter and 30 meter length dep 11c biom kirandul complex

Construction of buttress wall towards eastern side drain slope of 994 mb bench 50 meter and 30 meter length dep 11c biom kirandul complex

Read more
Construction of buttress wall at the toe of existing waste dump, active dump (100 meter in length) 11b mining, biom kirandul complex

Construction of buttress wall at the toe of existing waste dump, active dump (100 meter in length) 11b mining, biom kirandul complex

Read more
Construction of buttress wall below 1053 mb level near 1065 mb level (45 meter in length) at dep 14, biom kirandul complex

Construction of buttress wall below 1053 mb level near 1065 mb level (45 meter in length) at dep 14, biom kirandul complex

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise