Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
02/Eej/2025 26
|
| Description |
Installation Of Sign Board Of Nit Jalandhar From Prominent Locations Along National Highway Between Jalandhar Railway Station And Bidhipur
|
| Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
| Tender Id | 110688 |
|
Reference Number |
02/EEJ/2025-26 |
| Tender Fee | 0 |
| EMD | 40304 |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=637077642463707764243131303638382430322f45454a2f323032352d3236 |
| Start Date | April 29, 2025 19:15 |
| End Date |
Expired
06/05/2025
Expired 531 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of chutes/drains at various locations along the green belt developed between arail and bandha road in naini, to prevent soil erosion caused by rainfall.
Construction of chutes/drains at various locations along the green belt developed between arail and bandha road in naini, to prevent soil erosion caused by rainfall.
Read moreConstruction of truck lay-byes at 8 locations between the already provisioned wsas on rajasthan gujarat border to santalpur section of 6 lane access controlled greenfield amritsar-jamnagar economic corridor (nh-754a) in the state of gujarat
Construction of truck lay-byes at 8 locations between the already provisioned wsas on rajasthan gujarat border to santalpur section of 6 lane access controlled greenfield amritsar-jamnagar economic corridor (nh-754a) in the state of gujarat
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (tl 26.039km mcw fob loop ramp) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (tl 26.039km mcw fob loop ramp) in up on ham
Read moreConstruction of link road along ibb between bp no 2270 to 2300 at govindbari and wanshapara for length of 11.945 km in the state of tripura package no tr lr g and w 2nd call
Construction of link road along ibb between bp no 2270 to 2300 at govindbari and wanshapara for length of 11.945 km in the state of tripura package no tr lr g and w 2nd call
Read moreConstruction of retaining/protection walls at required locations and undertaking other necessary improvement works along the road from ashtami ambedkar nagar to the railway station within the jurisdiction of roha ashtami municipal council.
Construction of retaining/protection walls at required locations and undertaking other necessary improvement works along the road from ashtami ambedkar nagar to the railway station within the jurisdiction of roha ashtami municipal council.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreIe services for development of link cc between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg1 from km0.000-km7.926 (20.000 km mcw loop ramplink road) in uttar pradesh on ham
Ie services for development of link cc between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg1 from km0.000-km7.926 (20.000 km mcw loop ramplink road) in uttar pradesh on ham
Read moreIe services for development of link cc between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (26.039 km including mcw fob loop ramp) in uup on ham
Ie services for development of link cc between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg2 from km7.926-km18.560 (26.039 km including mcw fob loop ramp) in uup on ham
Read moreImprovement of morth identified blackspots through construction of grade separators at selected locations along nh 75 corridor bw km.216.91 to km.302.42 with an effective improvement length 25.6 km under nh(o) on epc mode in the state of karnataka
Improvement of morth identified blackspots through construction of grade separators at selected locations along nh 75 corridor bw km.216.91 to km.302.42 with an effective improvement length 25.6 km under nh(o) on epc mode in the state of karnataka
Read moreDesign, supply, erection, testing & commissioning of railway electrification work of 2x25 kv ac ohe traction system along with boundary sectioning posts (bsps), sub-sectioning posts (ssps) between sahjanwa (excl.) to bansgaon (incl.) section in connection with sahjanwa - dohrighat new bg line project in n.e. railway of lucknow division
Design, supply, erection, testing & commissioning of railway electrification work of 2x25 kv ac ohe traction system along with boundary sectioning posts (bsps), sub-sectioning posts (ssps) between sahjanwa (excl.) to bansgaon (incl.) section in connection with sahjanwa - dohrighat new bg line project in n.e. railway of lucknow division
Read moreof your Industry type