Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Sewage Treatment Plant Of 10.00 Mld Based On Sbr (Sequential Batch Reactor) Technology In Sector 29, Pinjore Kalka Urban Comple
|
| Description |
Construction Of Sewage Treatment Plant Of 10.00 Mld Based On Sbr (Sequential Batch Reactor) Technology In Sector 29, Pinjore Kalka Urban Comple
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2025_HRY_485585_1 |
|
Reference Number |
20259B31A5F2 AE41 4CA9 AEE9 DCCA5D5BAB9F2239003 |
| Tender Fee | 20000 |
| EMD | 50.24 Lakh |
| Tender Value | - |
| Place | Pinjore |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=563619 |
| Start Date | November 26, 2025 17:00 |
| End Date |
Expired
23/12/2025
Expired 298 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Intercepting sewer line gravity main treated effluent main 10.00 mld sewage treatment plant at nagar palika parishad mahoba district mahoba
Intercepting sewer line gravity main treated effluent main 10.00 mld sewage treatment plant at nagar palika parishad mahoba district mahoba
Read moreDpr for design and construction of 20 mld into 2.5 peak factor 50 mld main sewage pumping station, 20 mld sewage treatment plant based on sequential batch reactor (sbr) technology, tertiary treatment plant. boundary wall, roads, platforms, d.g. set,
Dpr for design and construction of 20 mld into 2.5 peak factor 50 mld main sewage pumping station, 20 mld sewage treatment plant based on sequential batch reactor (sbr) technology, tertiary treatment plant. boundary wall, roads, platforms, d.g. set,
Read moreDesign, engineering, build and commissioning of 100 mld capacity sewage treatment plant at panjappur with sequential batch reactor (sbr) with ttuf 10 mld including operation and maintenance for fifteen years at panjappur, tiruchirappalli city corpor
Design, engineering, build and commissioning of 100 mld capacity sewage treatment plant at panjappur with sequential batch reactor (sbr) with ttuf 10 mld including operation and maintenance for fifteen years at panjappur, tiruchirappalli city corpor
Read moreDesign, engineering, build and commissioning of 58 mld capacity sewage treatment plant at ramayanpatti with sequential batch reactor (sbr) including operation and maintenance for ten years at ramayanpatti, tirunelveli city municipal corporation
Design, engineering, build and commissioning of 58 mld capacity sewage treatment plant at ramayanpatti with sequential batch reactor (sbr) including operation and maintenance for ten years at ramayanpatti, tirunelveli city municipal corporation
Read moreInstallation of mbbr (moving bed bio film reactor)/sbr (sequential batch reactor) along with other units at khandra ug under bankola area.
Installation of mbbr (moving bed bio film reactor)/sbr (sequential batch reactor) along with other units at khandra ug under bankola area.
Read moreOperation and comprehensive maintenance of sewage treatment plant of 4.21 mld capacity based on sequential batch reactor technology in moti daman urban area.
Operation and comprehensive maintenance of sewage treatment plant of 4.21 mld capacity based on sequential batch reactor technology in moti daman urban area.
Read moreDesign, engineering, procurement and construction including hydraulic testing, satisfactory trials and commissioning of 0.75 mld capacity sewage treatment plant (stp) based on sequential batch reactor (sbr)/mbr or any equivalent technology followed b
Design, engineering, procurement and construction including hydraulic testing, satisfactory trials and commissioning of 0.75 mld capacity sewage treatment plant (stp) based on sequential batch reactor (sbr)/mbr or any equivalent technology followed b
Read moreDesign engineering build and commissioning of 9 05 mld capacity sewage treatment plant at arupathy village with sequential batch reactor sbr and 0 44 mld packaged stp at sitharkadu including operation and maintenance for ten years at mayiladuthurai
Design engineering build and commissioning of 9 05 mld capacity sewage treatment plant at arupathy village with sequential batch reactor sbr and 0 44 mld packaged stp at sitharkadu including operation and maintenance for ten years at mayiladuthurai
Read moreOperation and comprehensive maintenance of sewage treatment plant of 4.21 mld capacity based on sequential batch reactor technology and sewer network in moti daman urban area
Operation and comprehensive maintenance of sewage treatment plant of 4.21 mld capacity based on sequential batch reactor technology and sewer network in moti daman urban area
Read moreDesign, survey, engg., const., supply, erection, testing and commissioning of 45 mld sewerage treatment plant cum water reclamation facility at sec-1, g.noida based on sbr (sequential batch reactor) technology (sbr) including o and m for 120 month
Design, survey, engg., const., supply, erection, testing and commissioning of 45 mld sewerage treatment plant cum water reclamation facility at sec-1, g.noida based on sbr (sequential batch reactor) technology (sbr) including o and m for 120 month
Read moreof your Industry type