Tender Details
Particulars | Details |
---|---|
Title |
Deep Screening Of Plain Track Between Km 456/6 479/9 (Dn Line) &Amp Km 479/10 500/0 (Dn Line) In Chhapra Gorakhpur Cantt Section. (Total = 43.4 Km)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79306923 |
Reference Number |
NER-BSB-2024-153 |
Tender Fee | 0 |
EMD | 3.18 Lakh |
Tender Value | |
Place | Gorakhpur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/79306923/viewNitPdf_4820635.pdf |
Start Date | January 02, 2025 17:59 |
End Date |
28/01/2025 ( Expired 131 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
Read moreOne time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
Read more1. improvements to road from km 0/75 to 2/25 4/8 to 5/4 of allur to main road nandikotkur in nandyal district. 2. improvements to road from km 0/0 to 10/6 of brahmanakotkur midthur road in nandyal district.
1. improvements to road from km 0/75 to 2/25 4/8 to 5/4 of allur to main road nandikotkur in nandyal district. 2. improvements to road from km 0/0 to 10/6 of brahmanakotkur midthur road in nandyal district.
Read moreNctps i semii circle echs dn nctps aip railway siding recoupment of ballast in the deficiency area of 8th 9th track line inside nctps siding track by dumping spreading and deep screening of ballast
Nctps i semii circle echs dn nctps aip railway siding recoupment of ballast in the deficiency area of 8th 9th track line inside nctps siding track by dumping spreading and deep screening of ballast
Read moreMtps i chp i deep screening through packing lifting the track line ballast deficiency makeup work with 40mm hard broken stone ballast grinding the elongated edges of rails and reversing the grounded rails into its position in wagon tippler iii inhau
Mtps i chp i deep screening through packing lifting the track line ballast deficiency makeup work with 40mm hard broken stone ballast grinding the elongated edges of rails and reversing the grounded rails into its position in wagon tippler iii inhau
Read moreReplacement of 10 mtr. long stp pole with 9 mtr. long octagonal poles on dividing road sector-4 and 6 upto it park in sector-6 mdc panchkula and providing 3 nos. 200 kva transformers and ht/lt line in sector-2 mdc panchkula. (including six years defe
Replacement of 10 mtr. long stp pole with 9 mtr. long octagonal poles on dividing road sector-4 and 6 upto it park in sector-6 mdc panchkula and providing 3 nos. 200 kva transformers and ht/lt line in sector-2 mdc panchkula. (including six years defe
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read more(a) improvements to nathavaram to eg districts limits rb road 0/4km r/s to chammachintha-sarugudu rb road at 6/0 km l/s via gummidigonda from km 0/0 to 4/500 (b)kailasapatnam giduturu road from km 0/0 to 9/6. (c) narsipatnam-devipatnam sh 4/2 km r/s (cheedigummala) to p.g.peta via pakalapadu from km 0/0 to 5/100. (d) narsipatnam-devipatnam sh 26/4 km l/s (a.l.puram) to konkasingi from km 1/0 to 3/100 in anakapalli dist
(a) improvements to nathavaram to eg districts limits rb road 0/4km r/s to chammachintha- sarugudu rb road at 6/0 km l/s via gummidigonda from km 0/0 to 4/500 (b)kailasapatnam giduturu road from km 0/0 to 9/6. (c) narsipatnam-devipatnam sh 4/2 km r/s (cheedigummala) to p.g.peta via pakalapadu from km 0/0 to 5/100. (d) narsipatnam-devipatnam sh 26/4 km l/s (a.l.puram) to konkasingi from km 1/0 to 3/100 in anakapalli district
Read moreProviding led street light arrangements to the rob at km 1/6 of siruthaiyur to sengaraiyur road in lieu of existing lc no 226 at railway km 311/8-9 between kattur to lalgudi station at lalgudi in trichy district.
Providing led street light arrangements to the rob at km 1/6 of siruthaiyur to sengaraiyur road in lieu of existing lc no 226 at railway km 311/8-9 between kattur to lalgudi station at lalgudi in trichy district.
Read moreConstruction of bypass road to mothe village from km 0/0 to 1/0, byepass road to bheemgal town from km 0/0 to 1/5 and construction of road from devakkapet to thatipally road from km 0/0 to 10/0 (working reach from km 0/0 to 6/0) in nizamabad district. (subwork:- presurvey for providing consulatancy services)
Construction of bypass road to mothe village from km 0/0 to 1/0, byepass road to bheemgal town from km 0/0 to 1/5 and construction of road from devakkapet to thatipally road from km 0/0 to 10/0 (working reach from km 0/0 to 6/0) in nizamabad district. (subwork:- presurvey for providing consulatancy services)
Read moreof your Industry type