Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Liq.Chlorhexidine Gluconate 1.5 Percent Cetrimide 3.0 Percent
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106532234 |
|
Reference Number |
H5241251A |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/122024/106532234/viewNitPdf_4784928.pdf |
| Start Date | November 25, 2024 21:52 |
| End Date |
Expired
11/12/2024
Expired 669 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, installation and commissioning of demineralised water unit, capacity 1.5 cu. m. /h
Supply, installation and commissioning of demineralised water unit, capacity 1.5 cu. m. /h
Read moreRepair and maintenance of air conditioners (1.5 ton/2 ton) on amc and repairs of refrigerators and water coolers in bhupalpalli area for a period of two years. - reg.
Repair and maintenance of air conditioners (1.5 ton/2 ton) on amc and repairs of refrigerators and water coolers in bhupalpalli area for a period of two years. - reg.
Read moreLaying of cc road from h.no: 20-005 to 22-017 at girinagar under giri nagar ward-283, chintal circle-54 ,qbz,cmc (item no.2) (completion period 1.5 months)
Laying of cc road from h.no: 20-005 to 22-017 at girinagar under giri nagar ward-283, chintal circle-54 ,qbz,cmc (item no.2) (completion period 1.5 months)
Read moreSupply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Supply of new mahindra bolero pik-up 1.5 fitted with bathla vehicle-mounted telescopic ladder, complete with winch, pulley, self-locking mechanism, mounting arrangement, rto registration, road tax and insurance.
Read moreLaying of cc road in road no 4,7 and 8 in balreddy nagar under ganesh nagar ward-284, jeedimetla circle-55,qbz,cmc (reserved for st) (item no.6) (completion period 1.5 month)
Laying of cc road in road no 4,7 and 8 in balreddy nagar under ganesh nagar ward-284, jeedimetla circle-55,qbz,cmc (reserved for st) (item no.6) (completion period 1.5 month)
Read moreLaying of cc road from h.no : 49-411/4/c to 49-403/7/c at bapu nagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (item no.3) (completion period 1.5 month)
Laying of cc road from h.no : 49-411/4/c to 49-403/7/c at bapu nagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (item no.3) (completion period 1.5 month)
Read moreLaying of cc road from 49-128/2/b to 49-128/2/a at cherukupally colony, padma nagar phase ii, under padma nagar-285, jeedimetla circle-55,qpz, cmc (item no.4) (completion period 1.5 month)
Laying of cc road from 49-128/2/b to 49-128/2/a at cherukupally colony, padma nagar phase ii, under padma nagar-285, jeedimetla circle-55,qpz, cmc (item no.4) (completion period 1.5 month)
Read moreProviding of temporary lighting on hire basis with 110/120w led lights at various locations in nacharam circle -8 on the occasion of bathukamma festival for 2 days in the month of october-2026.(rs: 1.5 lakhs)
Providing of temporary lighting on hire basis with 110/120w led lights at various locations in nacharam circle -8 on the occasion of bathukamma festival for 2 days in the month of october-2026.(rs: 1.5 lakhs)
Read moreLaying of cc road at a)shivalayam ( opposite hindu graveyard) at padma nagar and b) h.no : 49-243/1/a to shop no 49/243 at balreddynagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (reserved for sc) (item no.5) (completion period 1.5 month)
Laying of cc road at a)shivalayam ( opposite hindu graveyard) at padma nagar and b) h.no : 49-243/1/a to shop no 49/243 at balreddynagar under padma nagar-285, jeedimetla circle-55, qpz, cmc (reserved for sc) (item no.5) (completion period 1.5 month)
Read moreDesign, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Read moreof your Industry type