Tender Details

About Tender

🏗️ Procurement Opportunity: Supply Of Junction Boxes 🏗️ Rajasthan Electronics And Instruments Ltd (Reil), Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Offers From Reputable Suppliers For The Supply Of Junction Boxes. 🔌 📅 Submission Deadline: June 3, 2024, 5:00 Pm (Gmt+5:30) This Tender Is Open To All Suppliers Capable Of Meeting The Specified Technical And Quality Requirements. Interested Parties Are Invited To Submit Their Offers By The Stipulated Deadline. Keywords: Junction Box, Supply, Electronics, Reil, Central Government, Tender, Offer Submission
Particulars Details
Title
Offer For Supply Of Junction Box
Description
Offer For Supply Of Junction Box
Organisation Rajasthan Electronics and Instruments Ltd | Central Govt. Ministry/Department
Tender Id 2024_REIL_757388_1
Reference
Number
REIL/MM/24-25/IND/E-PUB/24022
Tender Fee 0
EMD 0
Tender Value
Place REIL,JAIPUR
Link
View Original Tender Notice

https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1060850

Start Date May 22, 2024 22:45
End Date
Expired 03/06/2024

Expired 780 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Design, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.

Design, engg, supply, erection, testing and comi of dry ash pre con sys for augmentation of ahs sys.

Read more
Design, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.

Design, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.

Read more
Set of hex head plug screw

For complete deion and other details, please refer to tender

Read more
Consultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k

Consultancy services for preparation of detailed project report for 4-laning of katra reasi mahore gulabgarh nandimarg to kulgam to nh44 in the ut of j-k

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Expression of interest to invite prospective and probable manufactures/suppliers various materials required for manufacturing of different types of parachutes

Expression of interest to invite prospective and probable manufactures/suppliers various materials required for manufacturing of different types of parachutes

Read more
Procurement of control interface module (cim) for 20 cum er shovel

Procurement of control interface module (cim) for 20 cum er shovel

Read more
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.

Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise