Particulars | Details |
---|---|
Title |
For Loading Unloading Carriage And Laying Of 3x300 Sq Mm Xlpe Power Cable At 220 Kv Rewa Road Prayagraj
|
Description |
For Loading Unloading Carriage And Laying Of 3x300 Sq Mm Xlpe Power Cable At 220 Kv Rewa Road Prayagraj
|
Organisation | UP Power Transmission Corp.Ltd (Operation) | State Govt. and UT |
Tender Id | 2025_UPTCL_1019776_1 |
Reference Number |
21/ETD-II(P)/2024-25 |
Tender Fee | 590 |
EMD | 1000 |
Tender Value | |
Place | 220 KV Rewa Road |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1855408 |
Start Date | April 09, 2025 22:30 |
End Date |
22/04/2025 ( Expired 75 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreDesign and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc
Design and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc
Read moreDesign and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road
Design and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road
Read moreConstruction of 220/132 kv, 160 mva and 132/33 kv, 1x31.5 mva gss at bambloo (district-bikaner) along with 01 no. of 33 kv, 5.43 mvar capacitor bank at 220 kv gss, bambloo and 2x220 kv bays at 220 kv gss seruna work on turnkey basis bn9019002518
Construction of 220/132 kv, 160 mva and 132/33 kv, 1x31.5 mva gss at bambloo (district-bikaner) along with 01 no. of 33 kv, 5.43 mvar capacitor bank at 220 kv gss, bambloo and 2x220 kv bays at 220 kv gss seruna work on turnkey basis bn9019002518
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreProviding, laying, jointing, testing and commissioning of 100 mm dia m.s. pipeline and construction of sumpwell all allied civil work at ashapura gram mhow (as per schedule)
Providing, laying, jointing, testing and commissioning of 100 mm dia m.s. pipeline and construction of sumpwell all allied civil work at ashapura gram mhow (as per schedule) &#x0d &#x0d
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreConstruction of 1 no bay and its allied civil works for 66 kv s s jalal at 66 kv s s bhagta bhai ka under op. circle, bathinda
Construction of 1 no bay and its allied civil works for 66 kv s s jalal at 66 kv s s bhagta bhai ka under op. circle, bathinda
Read moreConstruction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle.
Construction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle
Read moreConstruction of compound wall at north side(towards nagarkurnool i and ii bays side) to the extent of 400 kv ss land at 400/220 kv dindi ss in nagarkurnool district in mahabubnagar circle.