Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Overhauling Of Rotary Air Preheaters During Forthcoming Overhauling Of 600 Mw Unit Ii Rgtpp, Hpgcl, Khedar, Hisar
|
| Description |
Overhauling Of Rotary Air Preheaters During Forthcoming Overhauling Of 600 Mw Unit Ii Rgtpp, Hpgcl, Khedar, Hisar
|
| Organisation | Haryana Board Corporation | State Govt. and UT |
| Tender Id | 2025_HBC_483223_1 |
|
Reference Number |
2025C5AB2D87 4F45 422D 87AD 5C811A14AB51712PGC |
| Tender Fee | 2360 |
| EMD | 59900 |
| Tender Value | - |
| Place | KHEDAR |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=561224 |
| Start Date | November 13, 2025 22:30 |
| End Date |
Expired
15/12/2025
Expired 303 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of chequered plate to rgtpp, khedar, hisar
Supply of chequered plate to rgtpp, khedar, hisar
Read moreComplete acid alkali dosing unloading pump to rgtpp khedar hisar
Complete acidalkali dosing unloading pump to rgtpp khedar hisar
Read moreSupply of various spares for mill reject system to rgtpp, khedar, hisar
Supply of various spares for mill reject system to rgtpp, khedar, hisar
Read moreSupply of spares of coal mills (hp-1103) to rgtpp, khedar, hisar on staggered basis
Supply of spares of coal mills (hp-1103) to rgtpp, khedar, hisar on staggered basis
Read moreAllotment of shop no. 2 (gf) in shopping complex at rgtpp colony khedar
Allotment of shop no. 2 (gf) in shopping complex at rgtpp colony khedar
Read moreAllotment of shop no. 3 (gf) in shopping complex at rgtpp colony khedar
Allotment of shop no. 3 (gf) in shopping complex at rgtpp colony khedar
Read moreArc for operation and maintenance of ericsson make epabx system installed at 2x600 mw rgtpp, khedar, hisar (except main exchange) from main distribution frame (mdf) to subscriber end for two years.
Arc for operation and maintenance of ericsson make epabx system installed at 2x600 mw rgtpp, khedar, hisar (except main exchange) from main distribution frame (mdf) to subscriber end for two years.
Read moreAnnual running contract for operation and maintenance of automated plc controlled comprehensive hydropneumatic wet and dry vacuum based ash handling system including ash silos and ash water recovery system of 2x600 mw units, rgtpp, khedar, hisar
Annual running contract for operation and maintenance of automated plc controlled comprehensive hydropneumatic wet and dry vacuum based ash handling system including ash silos and ash water recovery system of 2x600 mw units, rgtpp, khedar, hisar
Read morePainting works on tg and spray painting during overhauling unit 2
Painting works on tg and spray painting during overhauling unit 2
Read moreTtps mechii tm i unitiii inspection painting overhauling of condenser cw pipelines hotwells etc during the forthcoming annual overhaul
Ttps mechii tm i unitiii inspection painting overhauling of condenser cw pipelines hotwells etc during the forthcoming annual overhaul
Read moreof your Industry type