Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing Protection Wall At Loc No.3,12,13 And 14 Of 400k V D/C Jamshedpur Baripada Line Under Jamshedpur S/S
|
Description |
Providing Protection Wall At Loc No.3,12,13 And 14 Of 400k V D/C Jamshedpur Baripada Line Under Jamshedpur S/S
|
Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1.08 Lakh |
Tender Value | |
Place | JAMSHEDPUR, JHARKHAND |
Link |
AAAAAAAAAA Login to view |
Start Date | June 27, 2025 21:00 |
End Date |
26/07/2025 ( 28 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreConstruction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Construction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreRequest for proposal for selection of agency for operation and maintenance of s lawn at janeshwar mishra park gate no 5 lucknow
Request for proposal for selection of agency for operation and maintenance of s lawn at janeshwar mishra park gate no 5 lucknow
Read moreRepair of flooring, joinery incl connected b and r works to certain otm and md accn at 14 gtc subathu under ge kasauli
Repair of flooring, joinery incl connected b and r works to certain otm and md accn at 14 gtc subathu under ge kasauli
Read moreProviding and installation of water chiller and 500 ltr per hour reverse omsosis at making 12x10 room for cold water drinking water at gandhi market nagar nigam gwalior file no. 204/25x9/1
Providing and installation of water chiller and 500 ltr per hour reverse omsosis at making 12x10 room for cold water drinking water at gandhi market nagar nigam gwalior file no. 204/25x9/1
Read moreConstruction of road and drain at different ward under the chief minister s urban infrastructure development scheme 4 th phase
Construction of road and drain at different ward under the chief minister s urban infrastructure development scheme 4 th phase
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreof your Industry type