Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Pcc Road From Seakhpara Village More To Sk Asgar House At Kalinagar Gp Under Uluberia I Dev. Block
|
| Description |
Construction Of Pcc&Amp#X0d
Road From Seakhpara&Amp#X0d
Village More To Sk&Amp#X0d
Asgar House At&Amp#X0d
Kalinagar Gp Under&Amp#X0d
Uluberia I Dev. Block
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2024_ZPHD_668897_1 |
|
Reference Number |
WB/HZP/ULU-I/PS/11/2/23-24/SL2 |
| Tender Fee | 0 |
| EMD | 13191 |
| Tender Value | - |
| Place | Kalinagar GP |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1452189 |
| Start Date | February 17, 2024 22:30 |
| End Date |
Expired
26/02/2024
Expired 960 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of pcc kamiadih sahdev rajwars house to gopalpur hatiya more.(l 0.220km)
Construction of pcc kamiadih sahdev rajwars house to gopalpur hatiya more.(l 0.220km)
Read moreConstruction of pcc road from pwd road dakhi more to tetar in sonbigha in village-sonbigha, panchayat-aara, block-chatra.
Construction of pcc road from pwd road dakhi more to tetar in sonbigha in village-sonbigha, panchayat-aara, block-chatra.
Read moreProviding and fixing pcc benches and steel pipe benches in various parks and green belt of sunder nagar maulijagran part-ii,chandigarh under ward dev. fund.c
Providing and fixing pcc benches and steel pipe benches in various parks and green belt of sunder nagar maulijagran part-ii,chandigarh under ward dev. fund.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreConstruction of pcc road from seakhpara village more to sk asgar house at kalinagar gp under uluberia-i dev. block
Construction of pcc&#x0d road from seakhpara&#x0d village more to sk&#x0d asgar house at&#x0d kalinagar gp under&#x0d uluberia-i dev. block
Read moreConstruction of park at kalinagar under uluberia-i dev. block
Construction of park at kalinagar under uluberia-i dev. block
Read moreConstruction of csc 1 (one) unit near kalinagar rangamati park at kalinagar gram panchayet under uluberia-1 dev. block
Construction of csc 1 (one) unit&#x0d near kalinagar rangamati&#x0d park at kalinagar gram&#x0d panchayet under uluberia-1&#x0d dev. block
Read moreConstruction of pcc road from the asgar sk to aman sk house sansad vi.
Construction of pcc road from the asgar sk to aman sk house sansad vi.
Read morePcc road from sk asgar ali house to sk jamaluddin house at pansila paschim
Pcc road from sk asgar ali house to sk jamaluddin house at pansila paschim
Read moreof your Industry type