Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Nctps Ii Mi Circle Mpm Unit Ii Mills 2 A To 2 J Rectification Strengthening Of Existing Damaged Expansion
|
Description |
Nctps Ii Mi Circle Mpm Unit Ii Mills 2 A To 2 J Rectification Strengthening Of Existing Damaged Expansion
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_569403_1 |
Reference Number |
CE NCTPS II SE M I O M 38 2025 26 |
Tender Fee | 0 |
EMD | 6100 |
Tender Value | |
Place | SE MI NCTPS II |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=680195 |
Start Date | June 16, 2025 17:30 |
End Date |
23/06/2025 ( Expired 22 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for preparation of detailed project report for the work widening and strengthening of existing 2l to 2lps from km 40/00 to 68/600 km podamari to mohana of nh-326 and from km 0/00 to km 102/900 mohana to paralakhemundi of nh 326a
Consultancy services for preparation of detailed project report for the work widening and strengthening of existing 2l to 2lps from km 40/00 to 68/600 km podamari to mohana of nh-326 and from km 0/00 to km 102/900 mohana to paralakhemundi of nh 326a
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConsultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Read moreInstallation of coal slurry settling plant (cssp) for unit 1 to 6 and dosing system for existing cssp of unit 7 and 8 chp, mtps
Installation of coal slurry settling plant (cssp) for unit 1 to 6 and dosing system for existing cssp of unit 7 and 8 chp, mtps
Read moreComprehensive repair / maintenance of chillers, ahu unit, cooling tower, compressor, condensor, expansion valves of ac plant alongwith allied b/r wks of zone ii locations of nad explosive area at naval station karanja
Comprehensive repair / maintenance of chillers, ahu unit, cooling tower, compressor, condensor, expansion valves of ac plant alongwith allied b/r wks of zone ii locations of nad explosive area at naval station karanja
Read moreReconstruction of reengus rob destressed re wall lhs and strengthening of existing reengus rob rhs in jaipur-reengus sikar section of nh 52 from km 296.200 to 297.350 (total length 1150m) in the state of rajasthan on item rate (percentage) basis
Reconstruction of reengus rob destressed re wall lhs and strengthening of existing reengus rob rhs in jaipur-reengus sikar section of nh 52 from km 296.200 to 297.350 (total length 1150m) in the state of rajasthan on item rate (percentage) basis
Read moreRepairs and maintenance to certain roads, road furnitures, kerb stones at 613 unit of age br- ii under ge golconda
Repairs and maintenance to certain roads, road furnitures, kerb stones at 613 unit of age br- ii under ge golconda
Read moreMajor maintenance through strengthening overlay of the existing highway from km.103.050 (athur) to km.119.800 (salavathi) on tambaram to tindivanam section of nh-32 (nh-45) in the state of tamil nadu on item rate (percentage) basis
Major maintenance through strengthening overlay of the existing highway from km.103.050 (athur) to km.119.800 (salavathi) on tambaram to tindivanam section of nh-32 (nh-45) in the state of tamil nadu on item rate (percentage) basis
Read moreWork contract for annual prive/breakdown maintenance of non pressure parts of boiler and its auxiliaries for unit no. 1 to 4 of 210 mw of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Work contract for annual prive/breakdown maintenance of non pressure parts of boiler and its auxiliaries for unit no. 1 to 4 of 210 mw of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Read moreRepair to road of unit and md accn of age b r i and ii under ge (west) ferozepur cantt
Repair to road of unit and md accn of age b r i and ii under ge (west) ferozepur cantt
Read moreof your Industry type