Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Nctps Ii Mi Circle Mpm Unit Ii Mills 2 A To 2 J Rectification Strengthening Of Existing Damaged Expansion
|
Description |
Nctps Ii Mi Circle Mpm Unit Ii Mills 2 A To 2 J Rectification Strengthening Of Existing Damaged Expansion
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 6100 |
Tender Value | |
Place | SE MI NCTPS II |
Link |
AAAAAAAAAA Login to view |
Start Date | June 16, 2025 17:30 |
End Date |
23/06/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreCa no.cwe bly/ge (e)/21 of 2025- 2026special repairs to otm bldg no t-102 and t-26 of 6 mtn div ord unit and otm bldg no t-90 t-96 or living and t-100 mi room of 883 bn asc under ge east bareilly
Ca no.cwe bly/ge (e)/21 of 2025- 2026special repairs to otm bldg no t-102 and t-26 of 6 mtn div ord unit and otm bldg no t-90 t-96 or living and t-100 mi room of 883 bn asc under ge east bareilly
Read moreImpvt. such as widening and strengthening of komtalpeta- muniguda-tumudibandha road (sh-5) from 30/0 to 45/615 km and from 52/770 to 68/055 km including strengthening of existing 6340m. and excluding proposed bisamcuttack by-pass road 4500m.
Impvt. such as widening and strengthening of komtalpeta- muniguda-tumudibandha road (sh-5) from 30/0 to 45/615 km and from 52/770 to 68/055 km including strengthening of existing 6340m. and excluding proposed bisamcuttack by-pass road 4500m.
Read moreWork of strengthening the damaged road from palwada road to holi chowk via krishna ashram in brajghat
Work of strengthening the damaged road from palwada road to holi chowk via krishna ashram in brajghat&#x0d
Read moreStrengthening work of damaged road of jawahar ganj mandi from garh meerut road to hapur delhi road in garhmukteshwar
Strengthening work of damaged road of jawahar ganj mandi from garh meerut road to hapur delhi road in garhmukteshwar
Read moreProcurement of coal inlet pipe with flange and ss centre sleeve suitable for 8.5 e 9 coal mill of unit no. 1 to 4, ph-i and ii, at sgtps, mppgcl, birsinghpur.
Procurement of coal inlet pipe with flange and ss centre sleeve suitable for 8.5 e 9 coal mill of unit no. 1 to 4, ph-i and ii, at sgtps, mppgcl, birsinghpur.
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreStrengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Read moreConstruction of stone masonry wall along the existing footpath from forebay to sidrapong power house, repairing of the footpath and cross drain along with other necessary rectification works at sidrapong hydro electric project
Construction of stone masonry wall along the existing footpath from forebay to sidrapong power house, repairing of the footpath and cross drain along with other necessary rectification works at sidrapong hydro electric project
Read moreImprovement works by providing waterproof coating to existing damaged terrace tile after pointing, replastering and colour washing the back side wall of the division office building thirupathur
Improvement works by providing waterproof coating to existing damaged terrace tile after pointing, replastering and colour washing the back side wall of the division office building thirupathur
Read moreof your Industry type