Tender Details

Particulars Details
Title
Construction Of Border Flood Lighting Along Indo Bangladesh Border In The State Of Tripura From Bp No. 2214/3 Ri To 2217/ 5 Ri, (4.90 Km) (Pkg No Udaifl S)
Description
Construction Of Border Flood Lighting Along Indo Bangladesh Border In The State Of Tripura From Bp No. 2214/3 Ri To 2217/ 5 Ri, (4.90 Km) (Pkg No Udaifl S)
Organisation National Projects Construction Corporation Limited | Public Sector Undertakings
Tender Id 2024_NPCC_186064_1
Reference
Number
NPCC/NEZ/GHY/IBB/BFL/TR/37
Tender Fee 11800
EMD 5.71 Lakh
Tender Value
Place Tripura
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=203605
Start Date February 14, 2024 15:30
End Date

23/02/2024 ( Expired 485 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Read more
Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)

Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Read more
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Read more
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Read more
Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state

Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state

Read more
Independent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)

Independent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)

Read more
Improvement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.

Improvement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.

Read more
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise