Tender Details

Particulars Details
Title
Construction Of Border Flood Lighting Along Indo Bangladesh Border In The State Of Tripura From Bp No. 2214/3 Ri To 2217/ 5 Ri, (4.90 Km) (Pkg No Udaifl S)
Description
Construction Of Border Flood Lighting Along Indo Bangladesh Border In The State Of Tripura From Bp No. 2214/3 Ri To 2217/ 5 Ri, (4.90 Km) (Pkg No Udaifl S)
Organisation National Projects Construction Corporation Limited | Public Sector Undertakings
Tender Id 2024_NPCC_186064_1
Reference
Number
NPCC/NEZ/GHY/IBB/BFL/TR/37
Tender Fee 11800
EMD 5.71 Lakh
Tender Value
Place Tripura
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=203605
Start Date February 14, 2024 15:30
End Date

23/02/2024 ( Expired 423 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Engaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of indo-myanmar border (imb) between bp-179 to bp-186

Engaging technical consultant for preparation of fs and dpr and providing pre-construction activities for erection of fence and construction of track along the fence of indo-myanmar border (imb) between bp-179 to bp-186

Read more
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)

Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)

Read more
Improvement strengthening of road from burighat to sermunii in tripura length 15862 km under nesidsroads on engineering procurement construction epc mode

Improvement strengthening of road from burighat to sermunii in tripura length 15862 km under nesidsroads on engineering procurement construction epc mode

Read more
Construction of missing link road from naiyasar to jaisangsar road km. 0/0 to 5/0 under package no. rj-11-15/ml-np/2023-24

Construction of missing link road from naiyasar to jaisangsar road km. 0/0 to 5/0 under package no. rj-11-15/ml-np/2023-24

Read more
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24

Read more
Improvement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.

Improvement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.

Read more
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Read more
Upgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made

Upgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made

Read more
Independent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)

Independent engineer services for construction of strr (west side) nh948a kunigal (ramanagara taluk) to s. mudugadapalli (hosur taluk) from km 79 to km 144.25/144.00 (design chainage) phase-ii in karnataka on ham (project length 65.25 kms)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise