Tender Details

Particulars Details
Title
25 Kv Electrification Work In Connection With Provision Of Ramp For Fob At Various Station Of Under Jurisdiction Of Den G/Bsb (Krnd, Mma, Smz (Total 03 Station), Bsb Division Of N. E. Railway.
Description
25 Kv Electrification Work In Connection With Provision Of Ramp For Fob At Various Station Of Under Jurisdiction Of Den G/Bsb (Krnd, Mma, Smz (Total 03 Station), Bsb Division Of N. E. Railway.
Organisation Ministry of Railways
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date October 14, 2026 21:10
End Date
Open 05/11/2026

19 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
S&t work in connection with provision of ramp for fob at krnd, mma, smz, gyn, dlr, jkn, sdt & srnt and extension & raising of platform for 24 coaches at gyn, cc, gb, btt & dhe stations of varanasi division.

S&t work in connection with provision of ramp for fob at krnd, mma, smz, gyn, dlr, jkn, sdt & srnt and extension & raising of platform for 24 coaches at gyn, cc, gb, btt & dhe stations of varanasi division.

Read more
25 kv electrification work in connection with siwan yard modification work in bsb division of n. e. railway.

25 kv electrification work in connection with siwan yard modification work in bsb division of n. e. railway.

Read more
Amta - construction of new fob 6.00 wide with ramp connecting the connecting the circulating area to platform no. 1 & 2 at amta station under the jurisdiction of sr den east/kgp.

Amta - construction of new fob 6.00 wide with ramp connecting the connecting the circulating area to platform no. 1 & 2 at amta station under the jurisdiction of sr den east/kgp.

Read more
Extension of fob, pf shed, ramp and circulating area in connection with the work of utility shifting and renovation work at bankura station yard in adra division.

Extension of fob, pf shed, ramp and circulating area in connection with the work of utility shifting and renovation work at bankura station yard in adra division.

Read more
Provision of ramp for fob (both pf) under harmonized guideline for divyangjan facilitie at 10 station (govr, th, gaur, snc, lknr, jlhi, brck, gdk, mir, suj) total-20 ramps in ljn division.

Provision of ramp for fob (both pf) under harmonized guideline for divyangjan facilitie at 10 station (govr, th, gaur, snc, lknr, jlhi, brck, gdk, mir, suj) total-20 ramps in ljn division.

Read more
Provision of ramp section (gkc-bst) & (andn-subr) for fob (both pf) under harmonized guideline for divyangjan facilitie at 10 station (kpe, ite, gir, gaw, orw, mnd, crv, mhh, jtb, dmg) total-20 ramps in ljn division.

Provision of ramp section (gkc-bst) & (andn-subr) for fob (both pf) under harmonized guideline for divyangjan facilitie at 10 station (kpe, ite, gir, gaw, orw, mnd, crv, mhh, jtb, dmg) total-20 ramps in ljn division.

Read more
Electrical work connection to:- (i) provision of toilet for ss at 10 stations in cpj-the section and 11 stations in the-cpr section of bsb division (ii) provision of interlocking of level crossing gates more than 20000 tuv under jurisdiction of sr.dste-ii/bsb with rtu & power supply arrangement (total 04 no lc) (iii) provision of rail grinding machine siding at bkla, toi & muv (total 3 stations).

Electrical work connection to:- (i) provision of toilet for ss at 10 stations in cpj-the section and 11 stations in the-cpr section of bsb division (ii) provision of interlocking of level crossing gates more than 20000 tuv under jurisdiction of sr.dste-ii/bsb with rtu & power supply arrangement (total 04 no lc) (iii) provision of rail grinding machine siding at bkla, toi & muv (total 3 stations).

Read more
Construction of fob, pf shed and ramp in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna (cjn) station

Construction of fob, pf shed and ramp in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna (cjn) station

Read more
Signal & telecommunication work in connection with provision of central fob 12m wide including ramp in connection with development of amrit bharat station at bwn, bhp, rph, abka, ndae, kwae, bly, she, cgr,tak, az & kgle and provision of 6m wide fob with lifts at all platforms at konnagar (kog) station & uttarpara (upa) station in hwh division and other near by adjacent stations srp station and others under abss and trip maintenance / advance inspection centre for inspection and m

Signal & telecommunication work in connection with provision of central fob 12m wide including ramp in connection with development of amrit bharat station at bwn, bhp, rph, abka, ndae, kwae, bly, she, cgr,tak, az & kgle and provision of 6m wide fob with lifts at all platforms at konnagar (kog) station & uttarpara (upa) station in hwh division and other near by adjacent stations srp station and others under abss and trip maintenance / advance inspection centre for inspection and m

Read more
Manufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.

Manufacturing, supply and stacking of machine crushed track ballast conforming to rdso specification (irs-ge-1) with latest correction slips at bhanga (bxg) railway depot including loading into hopper/wagon/truck in connection with tbr between bpb-brgm-agtl (total= 88.900 tkm) under the jurisdiction of sr. den/v/lmg.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise