Tender Details
Particulars | Details |
---|---|
Title |
Rough cost estimate for construction of rmc road from patwari chowk to surjeet nagar in village machgar under mcf (recently added village).
|
Description |
Rough cost estimate for construction of rmc road from patwari chowk to surjeet nagar in village machgar under mcf (recently added village).
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2024_HRY_403506_1 |
Reference Number |
202414EE19DA 268A 449D A726 53A8EAB405C9284ULB |
Tender Fee | 2180 |
EMD | 36200 |
Tender Value | |
Place | Faridabad (MC) |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=479933 |
End Date |
21/10/2024 ( Expired 16 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4 lane with paved shoulders bypass to nalgonda town from design km 0.000 to km 14.000 length 14.00km existing ch km 18 710 to 28 685 of nakrekal to nagarjuna sagar section of nh 565 in the state of telangana on epc mode under annual
Construction of 4 lane with paved shoulders bypass to nalgonda town from design km 0.000 to km 14.000 length 14.00km existing ch km 18 710 to 28 685 of nakrekal to nagarjuna sagar section of nh 565 in the state of telangana on epc mode under annual
Read moreConsultancy services for authority engineer for supervision of widening/ improvement of existing road changwinti walong namti from km 0.00 to km 54.45 and hayuliang changwinti btw km 45.05 to km 50.82 under project udayak in arunachalpradesh on epc
Consultancy services for authority engineer for supervision of widening/ improvement of existing road changwinti walong namti from km 0.00 to km 54.45 and hayuliang changwinti btw km 45.05 to km 50.82 under project udayak in arunachalpradesh on epc
Read moreAAAAAAAAAA
Login to viewSupervision consultancy services for burdwan arambag road sh7 from 6_50 kmp to 32_625 km widening from 7 m to 10 m cw and strengthening work under burdwan division pwd in the district of purba bardhaman 2nd call
Read moreConstruction of vup for rectification of blackspot at location km 4 plus 100 meters near village deon on nh 754 in the state of punjab
Construction of vup for rectification of blackspot id pb 03 256 of series 2017 to 19 at location km 4 plus 100 meters near village deon on nh 754 in the state of punjab
Read moreWbpwd/pw(r)/se/shc/nit no 06 of 2024-2025 (sl-2)
Kolkata-basanti road from 68.00 to 96.255 km restoration of damages caused /to be caused by already laid /to be laid of pipe line by phe dte under several schemes within basanti block under south 24 parganas highway division in the district of
Read moreConstruction of 4 lane concrete white topping nagbhid city portion
Construction of 4 lane concrete white topping (wt) road in nagbhid city portion from 95/000 to 101/235 on nagpur-umred-nagbhir-brahmapuri-armori (nh-353d) in state of maharashtra
Read moreConstruction of 0.60 mld stp
Construction of 0.60 mld stp using mbbr technology for the work of construction of 528 tenements gplu3) at gandhi nagar and construction of 360 tenements g plus3 at anna nagar at pongalur village in avinashi taluk of tiruppur district under ahp hfa
Read moreConstruction of 4 lane access controlled greenfield highway from shardulla (khunti) to sithiyo (ranchi) of nh 143d ing from km 127.500 to km 150.300 (length 22.800 km) on ham under nh(o) in the state of jharkhand (package v)
Construction of 4 lane access controlled greenfield highway from shardulla (khunti) to sithiyo (ranchi) of nh 143d ing from km 127.500 to km 150.300 (length 22.800 km) on ham under nh(o) in the state of jharkhand (package v)
Read moreConstruction of four lane access controlled greenfield highway from latra to shardulla of nh 143d ing from km 103.000 to km 127.500 (length 24.500 km) on hybrid annuity mode (ham) under nh(o) in the state of jharkhand (package iv)
Construction of four lane access controlled greenfield highway from latra to shardulla of nh 143d ing from km 103.000 to km 127.500 (length 24.500 km) on hybrid annuity mode (ham) under nh(o) in the state of jharkhand (package iv)
Read moreIndependent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Independent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Read moreof your Industry type