Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Rajkot Division: Providing Rub/Lhs By Providing Rcc Box (1 X 6.0 M X 4.50 M) And U Wall / Approach Road At Lc No.17 At Km18/3 4, Surendranagar Dhrangdhra Section.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78203297 |
Reference Number |
DRM-RJT-2024-25-E-62 |
Tender Fee | 0 |
EMD | 4.09 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/78203297/viewNitPdf_4759537.pdf |
Start Date | October 30, 2024 00:04 |
End Date |
20/11/2024 ( Expired 229 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair of roads by providing and laying of ipb m-40 grade 80mm thick at gali no.1, h.no.2692 to 2730, gali no.3 h.no.2721 to 2663 and gali no.8, h.no. 2406 to 2423a of b block sgm nagar in ward no.17 (new ward) faridabad
Repair of roads by providing and laying of ipb m-40 grade 80mm thick at gali no.1, h.no.2692 to 2730, gali no.3 h.no.2721 to 2663 and gali no.8, h.no. 2406 to 2423a of b block sgm nagar in ward no.17 (new ward) faridabad
Read moreUrgent replacement of damaged slab culvert on the adibasighat - brikshathal road at ch. 0.600km under dasda sub-division, pwd(rnb) during the year 2025-26/ sh dismentling of existing culvert, rcc box cell (3.00 m x 3.00 m) and pucca drain etc.
Urgent replacement of damaged slab culvert on the adibasighat - brikshathal road at ch. 0.600km under dasda sub-division, pwd(rnb) during the year 2025-26/ sh dismentling of existing culvert, rcc box cell (3.00 m x 3.00 m) and pucca drain etc.
Read moreConstruction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Construction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Read moreConstruction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Construction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Read moreUrgent mtc. of ambassa - ganganagar road during the year 2025-26/ sh - construction of 01 (one) no r.c.c box cell culvert (2.00 m x 2.00 m), c.c retaining/ protection wall in/c road side u shape pucca drain at ch. 24.00 km.
Urgent mtc. of ambassa - ganganagar road during the year 2025-26/ sh - construction of 01 (one) no r.c.c box cell culvert (2.00 m x 2.00 m), c.c retaining/ protection wall in/c road side u shape pucca drain at ch. 24.00 km.
Read more1.construction of underground drain at reulgaon 2.construction of underground drain at reulgaon 3.providing paver block road 4.construction of underground rcc drain 5.making waste collection and segregation shedsat reulgaon tq basmath dist hingoli
1.construction of underground drain at reulgaon 2.construction of underground drain at reulgaon 3.providing paver block road 4.construction of underground rcc drain 5.making waste collection and segregation shedsat reulgaon tq basmath dist hingoli
Read moreA/r m/o other pwd roads under sub-division-iii, srd project division-i, pwd new delhi during 2025-26. sh providing and laying 600 mm dia m.s. pipeline by jack pushing technology at bhagwan dass chowk on boulevard road and laying of np3 rcc pipe n
A/r m/o other pwd roads under sub-division-iii, srd project division-i, pwd new delhi during 2025-26. sh providing and laying 600 mm dia m.s. pipeline by jack pushing technology at bhagwan dass chowk on boulevard road and laying of np3 rcc pipe n
Read moreUrgent mtc of road from dasda to anandabazar at ch. 4.90km under dasda sub division, pwd rnb during the year 2025 26 sh construction of rcc box cell 3.00 m x 3.00 m , approach works including carpeting and seal coat etc.
Urgent mtc of road from dasda to anandabazar at ch. 4.90km under dasda sub division, pwd rnb during the year 2025 26 sh construction of rcc box cell 3.00 m x 3.00 m , approach works including carpeting and seal coat etc.
Read moreMtc of road from chandrasingh para pwd road to harendra reang house under dasda sub division, pwd rnb during the year 2025 26 sh construction of rcc box cell 2.00 m x 2.00 m , approach works including laying of flat brick soling and edging etc
Mtc of road from chandrasingh para pwd road to harendra reang house under dasda sub division, pwd rnb during the year 2025 26 sh construction of rcc box cell 2.00 m x 2.00 m , approach works including laying of flat brick soling and edging etc
Read moreEstimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Estimate for approach road rcc with ratio-1 2 4 from main gate to power transformer foundation size20x3 mtr digging of 150 mm dia tube well including casing running mtr providing and fixing 5hp submersible pump with 2 year warranty at malhargarh
Read moreof your Industry type