Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Stone Pitching On Pokher Slop In Nagar Panchayat Barauli Gatta 1023
|
| Description |
Stone Pitching On Pokher Slop In Nagar Panchayat Barauli Gatta 1023
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_DOLBU_867701_1 |
|
Reference Number |
127/NPBARAULI/23-24 |
| Tender Fee | 4400 |
| EMD | 3.72 Lakh |
| Tender Value | - |
| Place | NAGAR PANCHAYAT BARAULI |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | December 05, 2023 21:30 |
| End Date |
Expired
26/12/2023
Expired 1023 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing stone pitching at panjamthangi vaari near highschool (down stream side) in inampudhuvadi panchayat in vaiyampatty block in tiruchirappalli district
Providing stone pitching at panjamthangi vaari near highschool (down stream side) in inampudhuvadi panchayat in vaiyampatty block in tiruchirappalli district
Read moreConstruction of stone pitching work in between rd 36.86okm to rd 37.480km of lift main canal under lift main canal division , kusumkhunti.
Construction of stone pitching work in between rd 36.86okm to rd 37.480km of lift main canal under lift main canal division , kusumkhunti.
Read moreRestoration of sloughed embankment on left side of river jhelum rd 43000m at okhoo by way of rcc cantilever retaining wall and stone pitching.
Restoration of sloughed embankment on left side of river jhelum rd 43000m at okhoo by way of rcc cantilever retaining wall and stone pitching.
Read moreExecution of stone crate and pitching work to prevent soil erosion along the roadside, caused by flood-induced waterlogging in the existing unlined drain situated beside the arail bandha in naini.
Execution of stone crate and pitching work to prevent soil erosion along the roadside, caused by flood-induced waterlogging in the existing unlined drain situated beside the arail bandha in naini.
Read moreRepair to hl bridge over nandhighore goudaput road such as construction of ptotection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Repair to hl bridge over nandhighore goudaput road such as construction of ptotection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Read moreRepair to bridge over river kusumi on saradhapur-bhadikila-ostia road such as construction of protection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Repair to bridge over river kusumi on saradhapur-bhadikila-ostia road such as construction of protection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Read moreRepair to hl bridge over river kusumi on kadalibandha to gunthasahi road such as construction of protection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Repair to hl bridge over river kusumi on kadalibandha to gunthasahi road such as construction of protection wall with stone pitching, berm dressing and overlaying of cc pavement at both approaches for the year 2026-27
Read moreConstruction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Read moreSpecial repairs to tea room facility adjoining bldg no 59 ,addn/altn to bldg no p-196 ,addition/alteration to washroom of arjan dd halls ,addition/alteration to washroom of manekshaw dd hall ,provision of stone pitching for sloping area at block no 3
Special repairs to tea room facility adjoining bldg no 59 ,addn/altn to bldg no p-196 ,addition/alteration to washroom of arjan dd halls ,addition/alteration to washroom of manekshaw dd hall ,provision of stone pitching for sloping area at block no 3
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreof your Industry type