Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Excavation,Brick Work,Soil Filling,Pcc,Flooring,Light Work,Lite Pole,Net,Painting Floor,Painting,Pl
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5680353 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | December 09, 2024 19:38 |
| End Date |
Expired
30/12/2024
Expired 653 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Earth filling and compaction,pcc concrete plinth,ms doors,aluminum sliding s,wall putty work,painting work,led ceiling panel light,ceiling fans,gypsum false ceiling,led tube lights,electrical wiring and distribution,painting of fabrication structure
Earth filling and compaction,pcc concrete plinth,ms doors,aluminum sliding s,wall putty work,painting work,led ceiling panel light,ceiling fans,gypsum false ceiling,led tube lights,electrical wiring and distribution,painting of fabrication structure
Read moreExcavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Excavation,excv rck dis out,excv hrd rck noblast,dismantl pcc,dismantl rcc,dismntl brick mason,availabl earth fill,ground surf dressing,shor 1.5-3m opn timb,brk flt surf 80 cl75,pcc,precast rcc,steel reinforcement,sfep str stl manual,fence brb wr,sf concertina 600mm,plaster,neat,pnt prm,painting of boundary wall - bld pnt snowcem 2c,fr scrn,pvr block,old paver block lay
Read more8515/e8 maint and repair/replacement to brick work, plastering work, pcc flooring, leakage/seepage, roofing sheet, ceiling, tiling of roof treatment and plumbing works including internal electrification of offrs accn under ge (east) bareilly
8515/e8 maint and repair/replacement to brick work, plastering work, pcc flooring, leakage/seepage, roofing sheet, ceiling, tiling of roof treatment and plumbing works including internal electrification of offrs accn under ge (east) bareilly
Read moreToughened glass partition 12mm,premium non-skid flooring tiles 2x2,acp panelling for iron poles,paver block base and painting work,wall tiles fixing work,brick work on paver edges,false ceiling work 40x30 shed
Toughened glass partition 12mm,premium non-skid flooring tiles 2x2,acp panelling for iron poles,paver block base and painting work,wall tiles fixing work,brick work on paver edges,false ceiling work 40x30 shed
Read moreRepair/ maint to tiling, pcc, brick work, ceiling, wall panelling, sanitary fittings, wpc door painting works including electrical works at rtc bldg in the area of age e/m (hosp) under ge e/m lucknow
Repair/ maint to tiling, pcc, brick work, ceiling, wall panelling, sanitary fittings, wpc door painting works including electrical works at rtc bldg in the area of age e/m (hosp) under ge e/m lucknow
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreDismantl brick mason,dismantl rcc,excv less than 3 rck dis out,s and f coarse sand,rcc plin 1 is to 1 5 is to 3 cs,rcc ab pl 1 is to 1 5 is to 3 cs,rcc roof 1 is to 1 5 is to 3 cs,brk msn pl cs cl75,brk msn ab pl cs c75,sl dpc coarse sand,steel reinforcement,plaster 18mm cs 1 is to 5,plaster 12mm cs 1 is to 5,neat cement punning,plaster 6mm cs 1 is to 4,vitrified 600x600x10,vitrified 600x600x10,granite flooring,louver glass powder,toughened glass 12mm,al partition powder,al section powder,led 2x2 reces 36w nw,db 32a elcb 100 ma,pvc conduit 32mm,pvc conduit 25mm,pvc conduit wall40mm,pvc conduit wall25mm,pt wire 3 4mm2,pt wire 3 2 5mm2,gi box 2 mod switch,gi box 3 mod switch,rec gi box 150x75x60,gi box 6 mod switch,gi box 12 mod switch,mod switch 5a,mod socket 5a,mod telephone socket,mod rj45 socket,cat6 cable,mod switch 15a,mod socket 15a,mcb switch sockets,split ac 2t
Dismantl brick mason,dismantl rcc,excv less than 3 rck dis out,s and f coarse sand,rcc plin 1 is to 1 5 is to 3 cs,rcc ab pl 1 is to 1 5 is to 3 cs,rcc roof 1 is to 1 5 is to 3 cs,brk msn pl cs cl75,brk msn ab pl cs c75,sl dpc coarse sand,steel reinforcement,plaster 18mm cs 1 is to 5,plaster 12mm cs 1 is to 5,neat cement punning,plaster 6mm cs 1 is to 4,vitrified 600x600x10,vitrified 600x600x10,granite flooring,louver glass powder,toughened glass 12mm,al partition powder,al section powder,led 2x2 reces 36w nw,db 32a elcb 100 ma,pvc conduit 32mm,pvc conduit 25mm,pvc conduit wall40mm,pvc conduit wall25mm,pt wire 3 4mm2,pt wire 3 2 5mm2,gi box 2 mod switch,gi box 3 mod switch,rec gi box 150x75x60,gi box 6 mod switch,gi box 12 mod switch,mod switch 5a,mod socket 5a,mod telephone socket,mod rj45 socket,cat6 cable,mod switch 15a,mod socket 15a,mcb switch sockets,split ac 2t
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreSupply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Supply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Read moreof your Industry type