Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Front End Wheel Loader 6 7 Cum Bucket Along With 01 Y Warranty And 02 Y Guarantee Spares
|
| Description |
|
| Organisation | MAHANADI COALFIELDS LIMITED | Ministry of Coal |
| Tender Id | GEM/2023/B/3401224 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | May 10, 2023 03:25 |
| End Date |
Expired
08/07/2023
Expired 1191 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Hiring of 2.3 cu.m bucket capacity front end loader for re-handling of coal and sand at ktk-1 gr mines (ktk-1, 5 and 6), bhupalpalli area for a period of two years with 6000 working hours - reg.
Hiring of 2.3 cu.m bucket capacity front end loader for re-handling of coal and sand at ktk-1 gr mines (ktk-1, 5 and 6), bhupalpalli area for a period of two years with 6000 working hours - reg.
Read moreHiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Read more2.5 cum bucket capacity front end loader
Hiring of 2.5 cum bucket capacity front end loader for re-handling of coal and sand at bhupalpalli mines for a period of two years (8000 hours) reg.
Read moreFront end wheel loader of coal bucket capacity not less than 5.0 cum along with 01 year warranty
Read more
Hiring of 2.3 cum bucket capacity front end loader
Hiring of 2.3 cu.m bucket capacity front end loader for re-handling of coal and sand at ktk-1 gr mines (ktk-1, 5 6), bhupalpalli area for a period of two years with 6000 working hours
Read moreHiring of 5.0 cum bucket capacity front end loader
Hiring of 5.0 cu.m bucket capacity font end loader for a period of 18 months at ktk oc-ii, bhupalpally area
Read moreof your Industry type