Tender Details
Particulars | Details |
---|---|
Title |
Conducting Structure Stability Audit Of Head Gear Structures And Ndt Of Vital Components Of Winding Engines Of Pit No 2 N Pit No 3 Of J.K Pit Of Siduli Colliery
|
Description |
Conducting Structure Stability Audit Of Head Gear Structures And Ndt Of Vital Components Of Winding Engines Of Pit No 2 N Pit No 3 Of J.K Pit Of Siduli Colliery
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_330934_1 |
Reference Number |
GM/KND/AE(ENM)/55(TN)/24-25/50 |
Tender Fee | 0 |
EMD | 9400 |
Tender Value | |
Place | Siduli Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342999 |
Start Date | March 03, 2025 22:30 |
End Date |
13/03/2025 ( Expired 86 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fixing of nut bolt and fabrication of head gear top platform fencing for 02 nos pit of central kajora colliery
Fixing of nut bolt and fabrication of head gear top platform fencing for 02 nos pit of central kajora colliery
Read moreFor partial repairing and installation of buchholz relay, winding and oil temperature meters of 500kva, 11kv/440v lighting transformer make kva process ltd sl no 11/1380 of sector 2 substation of east basuria colliery in respect of kusunda area.
For partial repairing and installation of buchholz relay, winding and oil temperature meters of 500kva, 11kv/440v lighting transformer make kva process ltd sl no 11/1380 of sector 2 substation of east basuria colliery in respect of kusunda area.
Read moreComplete repairing of k.e. make 90 hp, 3 phase, 550 volt slip ring motor at 15 no. direct haulage at pit no. 2 and prabhu make 150 hp, 550 v, 3 phase star-delta ers lying at fan house at pit no. b of pandaveswar colliery under pandaveswar area
Complete repairing of k.e. make 90 hp, 3 phase, 550 volt slip ring motor at 15 no. direct haulage at pit no. 2 and prabhu make 150 hp, 550 v, 3 phase star-delta ers lying at fan house at pit no. b of pandaveswar colliery under pandaveswar area
Read moreConstruction of permanent support of pit no. 2 bottom travelling route to 6d with brick pillar and girder support in kenda bottom seam of kunustoria colliery under kunustoria area
Construction of permanent support of pit no. 2 bottom travelling route to 6d with brick pillar and girder support in kenda bottom seam of kunustoria colliery under kunustoria area
Read moreBif. of wss for vill. majri jattan(2 no.) covered under existing dargahshah khalid (3 no.) dist. ropar (t/w, ohsr and c/w) (n-xxx)
Bif. of wss for vill. majri&#x0d jattan(2 no.) covered under existing dargahshah khalid (3&#x0d no.) dist. ropar (t/w, ohsr and c/w) (n-xxx)
Read moreConstruction of protective roof at no 2 and 3 pit at e.s.p unit of shyamsundarpur colliery.
Construction of protective roof at no 2 and 3 pit at e.s.p unit of shyamsundarpur colliery.
Read more(1) dismantling erection and repairing of 440 volt over head line from 6 pit to habitation near river side,agkcc,ka (2) repairing/maintenance of over head line 220 volt at 6 pit kcc and behind railway culvert,agkcc.(3) repairing and maintenance
(1) dismantling erection and repairing of 440 volt over head line from 6 pit to habitation near river side,agkcc,ka (2) repairing/maintenance of over head line 220 volt at 6 pit kcc and behind railway culvert,agkcc.(3) repairing and maintenance
Read moreRepairing of winding engine room munshi room at 8 no pit and at other places near safety talk station under bankola colliery
Repairing of winding engine room munshi room at 8 no pit and at other places near safety talk station under bankola colliery
Read moreTotal 16 nos of flexible trailing cable joint for sdl and udm trailing cable of 25 sqmm, 5 core, 1.1 kv grade for safe and smooth and safe sdl loading operation at pit no. b and 2 under pandaveswar colliery, pandaveswar area
Total 16 nos of flexible trailing cable joint for sdl and udm trailing cable of 25 sqmm, 5 core, 1.1 kv grade for safe and smooth and safe sdl loading operation at pit no. b and 2 under pandaveswar colliery, pandaveswar area
Read moreLaying, di and replacement of 20 pair and 10 pair armoured telecommunication cable from pit no. 2 to pit no. b and underground workings at pit no 2 under pandaveswar colliery, pandaveswar area
Laying, di and replacement of 20 pair and 10 pair armoured telecommunication cable from pit no. 2 to pit no. b and underground workings at pit no 2 under pandaveswar colliery, pandaveswar area
Read moreof your Industry type