Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Restoration Of Road Surface Likely To Be Put During Laying Of Ofc Cable From Mu Abad Lane No.01 To Mu Abad Opp. Lane No. 1 A,Sgr
|
Description |
Restoration Of Road Surface Likely To Be Put During Laying Of Ofc Cable From Mu Abad Lane No.01 To Mu Abad Opp. Lane No. 1 A,Sgr
|
Organisation | HAUDD | State Govt. and UT |
Tender Id | 2025_HAUDD_272324_3 |
Reference Number |
NIET 32 e-tendering /2024-25 LRWD |
Tender Fee | 200 |
EMD | 200 |
Tender Value | |
Place | MuAbad |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=841614 |
Start Date | February 11, 2025 23:30 |
End Date |
18/02/2025 ( Expired 131 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConsultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreConsultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu
Read moreUpgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreAsphlting of road from behind putlighar zafar kirana shop to rashid bhai briyani shop in ward no.09, zone no.05
Asphlting of road from behind putlighar zafar kirana shop to rashid bhai briyani shop in ward no.09, zone no.05
Read moreAsphlting of road from putlighar chauraha to masjid fakhruddin and various places in ward no.09, zone no.05
Asphlting of road from putlighar chauraha to masjid fakhruddin and various places in ward no.09, zone no.05
Read moreof your Industry type