Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Mech Ii Bm Unit I Removal And Relaying Of Insulation With Cladding Sheet In Unit I Esp Flue Gas Inlet Duct Outlet Duct Esp Hoppers For The Year 2024 2025
|
| Description |
Ttps Mech Ii Bm Unit I Removal And Relaying Of Insulation With Cladding Sheet In Unit I Esp Flue Gas Inlet Duct Outlet Duct Esp Hoppers For The Year 2024 2025
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_462013_1 |
|
Reference Number |
CE/TTPS/SE/M-II/No.377/2024-25 |
| Tender Fee | 0 |
| EMD | 8700 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=549049 |
| Start Date | July 11, 2024 19:30 |
| End Date |
Expired
30/07/2024
Expired 807 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ot 09 esp inlet and outlet and id fan inlet and outlet gates overhauling
Overhauling of esp inlet and outlet gates id fan inlet and outlet gates
Read moreTtps mechiibm unit iiirenewal of severely eroded parent duct plate in top side walls of aphab flue gas outlet duct and replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Ttps mechiibm unit iiirenewal of severely eroded parent duct plate in top side walls of aphab flue gas outlet duct and replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Read moreTtps mechii tm i unitiii removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of
Ttps mechii tm i unitiii removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of
Read moreTtps mechii bm unit iii inspection rectification of emitting electrode suspension frame in esp during annual overhaul for the year 2026 2027
Ttps mechii bm unit iii inspection rectification of emitting electrode suspension frame in esp during annual overhaul for the year 2026 2027
Read moreProcurement of 8 mm thick ms plate as per is 2062 for unit ii esp inlet duct
Procurement of 8 mm thick ms plate as per is 2062 for unit ii esp inlet duct
Read moreSupply of 10 mm thick m s plate as per is 2062 for unit iv air preheater esp columns and flue gas duct
Supply of 10 mm thick m s plate as per is 2062 for unit iv air preheater esp columns and flue gas duct
Read moreTtps mechii tm ii unit v inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of cond
Ttps mechii tm ii unit v inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of cond
Read moreTtps mechii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of
Ttps mechii tm ii unit iv inspection and rectification of epoxy cladding over the condenser water box and tube sheet east and west and rebuild the cladding with special epoxy putties ie average 4 5mm thick to be built up in the peeled off area of
Read moreTtps mechii ahp unitiii attending overhauling works in unit iii eco aph hoppers ash disposal system flushing apparatus rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in aph hopper platforms and d
Ttps mechii ahp unitiii attending overhauling works in unit iii eco aph hoppers ash disposal system flushing apparatus rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in aph hopper platforms and d
Read moreTtps mech ii bm unit iii replacement of wornout supports of eco hoppers inspection of water wall ring headers removal of debris and strengthening of economizer inlet header eco intermediate header steam cooled wall header no 8 and ltsh inlet header d
Ttps mech ii bm unit iii replacement of wornout supports of eco hoppers inspection of water wall ring headers removal of debris and strengthening of economizer inlet header eco intermediate header steam cooled wall header no 8 and ltsh inlet header d
Read moreof your Industry type