Tender Details

Particulars Details
Title
Providing Re Routing Of Lt Line From Existing 25 Kva S Stn., Tangta Due To Safety Reasons And Re Alignment Of Existing 3 Phase Lt Line In Village Khanalag From Existing 63 Kva S Stn. Khanalag
Description
Providing Re Routing Of Lt Line From Existing 25 Kva S Stn., Tangta Due To Safety Reasons And Re Alignment Of Existing 3 Phase Lt Line In Village Khanalag From Existing 63 Kva S Stn. Khanalag
Organisation HPSEBL | State Govt. and UT
Tender Id 2025_HPSEB_107866_1
Reference
Number
HPSEBL/AED/NIT-23/2025-26
Tender Fee 590
EMD 1574
Tender Value
Place under Electrical Divison,HPSEBL,ED,Arki
Link
View Original Tender Notice

https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=157777

Start Date June 19, 2025 16:00
End Date
Expired 02/07/2025

Expired 368 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tender for providing 1 phase lt extension from 63 kva 11 04 kv shilla 1 to jogna dogh near village shilla in e section barshaini under esd hpsebl jari

Tender for providing 1 phase lt extension from 63 kva 11 04 kv shilla 1 to jogna dogh near village shilla in e section barshaini under esd hpsebl jari

Read more
Tender for providing lt extension to newly constructed houses from 25kva dtr osan in e section bagicha under esd hpsebl bhuntar

Tender for providing lt extension to newly constructed houses from 25kva dtr osan in e section bagicha under esd hpsebl bhuntar

Read more
Tender for providing lt extension to newly constructed house form 25kva 11 04kv dtr tuniseri 100 kva 11 04kv dtr chhamakahu in e section bagicha under esd hpsebl bhuntar

Tender for providing lt extension to newly constructed house form 25kva 11 04kv dtr tuniseri 100 kva 11 04kv dtr chhamakahu in e section bagicha under esd hpsebl bhuntar

Read more
Maintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).

Maintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).

Read more
Shifting of 11 kv line/ss/lt line at- kalam, kalampat and suanar due to widening of udayapur banti (rd road culvert) to kakatpur road under r.w.e.s puri.

Shifting of 11 kv line/ss/lt line at-&amp#x0d kalam, kalampat and suanar due to&amp#x0d widening of udayapur banti (rd&amp#x0d road culvert) to kakatpur road&amp#x0d under r.w.e.s puri.

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Replacement of existing lt oh conductor to ug lt xlpe cable, lt panel feeder pillar with connected items in bldg. no p-7 to p-11, p-18 to p-21, p-59, p-60, p-61 to p-72, p-222, p-447 and stp md accn at jak li rc srinagar under ge 970 ews

Replacement of existing lt oh conductor to ug lt xlpe cable, lt panel feeder pillar with connected items in bldg. &#x0d no p-7 to p-11, p-18 to p-21, p-59, p-60, p-61 to p-72, p-222, p-447 and &#x0d stp md accn at jak li rc srinagar under ge 970 ews

Read more
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines

Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.

Read more
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Read more
In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.

In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise