Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Re Routing Of Lt Line From Existing 25 Kva S Stn., Tangta Due To Safety Reasons And Re Alignment Of Existing 3 Phase Lt Line In Village Khanalag From Existing 63 Kva S Stn. Khanalag
|
| Description |
Providing Re Routing Of Lt Line From Existing 25 Kva S Stn., Tangta Due To Safety Reasons And Re Alignment Of Existing 3 Phase Lt Line In Village Khanalag From Existing 63 Kva S Stn. Khanalag
|
| Organisation | HPSEBL | State Govt. and UT |
| Tender Id | 2025_HPSEB_107866_1 |
|
Reference Number |
HPSEBL/AED/NIT-23/2025-26 |
| Tender Fee | 590 |
| EMD | 1574 |
| Tender Value | |
| Place | under Electrical Divison,HPSEBL,ED,Arki |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=157777 |
| Start Date | June 19, 2025 16:00 |
| End Date |
Expired
02/07/2025
Expired 368 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for providing 1 phase lt extension from 63 kva 11 04 kv shilla 1 to jogna dogh near village shilla in e section barshaini under esd hpsebl jari
Tender for providing 1 phase lt extension from 63 kva 11 04 kv shilla 1 to jogna dogh near village shilla in e section barshaini under esd hpsebl jari
Read moreTender for providing lt extension to newly constructed houses from 25kva dtr osan in e section bagicha under esd hpsebl bhuntar
Tender for providing lt extension to newly constructed houses from 25kva dtr osan in e section bagicha under esd hpsebl bhuntar
Read moreTender for providing lt extension to newly constructed house form 25kva 11 04kv dtr tuniseri 100 kva 11 04kv dtr chhamakahu in e section bagicha under esd hpsebl bhuntar
Tender for providing lt extension to newly constructed house form 25kva 11 04kv dtr tuniseri 100 kva 11 04kv dtr chhamakahu in e section bagicha under esd hpsebl bhuntar
Read moreMaintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Maintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Read moreShifting of 11 kv line/ss/lt line at- kalam, kalampat and suanar due to widening of udayapur banti (rd road culvert) to kakatpur road under r.w.e.s puri.
Shifting of 11 kv line/ss/lt line at-&#x0d kalam, kalampat and suanar due to&#x0d widening of udayapur banti (rd&#x0d road culvert) to kakatpur road&#x0d under r.w.e.s puri.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreReplacement of existing lt oh conductor to ug lt xlpe cable, lt panel feeder pillar with connected items in bldg. no p-7 to p-11, p-18 to p-21, p-59, p-60, p-61 to p-72, p-222, p-447 and stp md accn at jak li rc srinagar under ge 970 ews
Replacement of existing lt oh conductor to ug lt xlpe cable, lt panel feeder pillar with connected items in bldg. 
 no p-7 to p-11, p-18 to p-21, p-59, p-60, p-61 to p-72, p-222, p-447 and 
 stp md accn at jak li rc srinagar under ge 970 ews
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreIn the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.
Read moreof your Industry type