Tender Details

Particulars Details
Title
Running, Maintenance, Operation And Management Of Health Centre In Sector 32 A, Samrala Road, Ludhiana. From 01.04.2025 To 31.03.2030
Description
Running, Maintenance, Operation And Management Of Health Centre In Sector 32 A, Samrala Road, Ludhiana. From 01.04.2025 To 31.03.2030&Amp#X0d &Amp#X0d
Organisation Department of Housing and Urban Development | State Govt. and UT
Tender Id 2025_DHUD_140142_1
Reference
Number
2025/691-693
Tender Fee 2864
EMD 2.96 Lakh
Tender Value
Place Ludhiana
Link https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=283910
Start Date May 13, 2025 19:15
End Date

02/06/2025 ( Expired 5 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand

Read more
Repair and maintenance of primary health care centre at mimi village of kiphire district in nagalan

Repair and maintenance of primary health care centre at mimi village of kiphire district in nagalan

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)

Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)

Read more
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)

Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)

Read more
Construction of mipi-andrathang road from km 20.000 to 50.000

Construction of mipi-andrathang road from km 20.000 to 50.000&#x0d (design length 34.880 km between km 20.000 to 54.880)green field&#x0d alignment to nhsl specifications in the aor of 62 rcc under 752 brtf&#x0d of project udayak in arunachal pradesh state

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise