Tender Details
Particulars | Details |
---|---|
Title |
Shifting Of 300 Kld And 200 Kld St Ps Based On Mbr Technology Including Dismantling Loading Transportation Erection Commissioning And Testing Complete In All Respects From Aerocity To It City And Sector 88/89 Sas Nagar Including One Year Of Mtc.
|
Description |
Shifting Of 300 Kld And 200 Kld St Ps Based On Mbr Technology Including Dismantling Loading Transportation Erection Commissioning And Testing Complete In All Respects From Aerocity To It City And Sector 88/89 Sas Nagar Including One Year Of Mtc.
|
Organisation | Department of Housing and Urban Development | State Govt. and UT |
Tender Id | 2024_DHUD_129318_1 |
Reference Number |
GMADA/DE (PH-1)/2024/2442-2455 Dated 29.10.2024 |
Tender Fee | 5901 |
EMD | 1.13 Lakh |
Tender Value | |
Place | SAS Nagar |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=262090 |
Start Date | October 30, 2024 22:30 |
End Date |
14/11/2024 ( Expired 183 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rewinding, reconditioning and replacements of spares for 850 kw, 6.6 kv, ht motor at peddapur ph-iv, pumping station, replacements spares for existing pumps at ph-iv, peddapur including dismantling, loading, transportation, unloading, erection, testing and commissioning of and ht motor mwss, eam cell-ii, peddapur under td-ii, patancheru
Rewinding, reconditioning and replacements of spares for 850kw, 6.6kv, ht motor at peddapur phase-iv, pumping station, replacements of spares for existing pumps at phase-iv, peddapur including dismantling, loading, transportation, unloading, erection, testing and commissioning of and ht motor under mwss, eam cell-ii, peddapur, transmission division no-ii, patancheru
Read moreDrilling lowering and commissioning of 4 no deep tubewells complete in all respects including pump chamber and connection with existing line etc at it city sas nagar.
Drilling lowering and commissioning of 4 no deep tubewells complete in all respects including pump chamber and connection with existing line etc at it city sas nagar.
Read moreEradication of congress grass, herbaceous and other wild growth form sector 48 c to 71, sector 76-80, aerocity rhs and lhs it city, sector 88-89 and sector dividing roads of gmada at sas nagar.
Eradication of congress grass, herbaceous and other wild growth form sector 48 c to 71, sector 76-80, aerocity rhs and lhs it city, sector 88-89 and sector dividing roads of gmada at sas nagar.
Read moreEradication of congress grass herbaceous and other wild growth form sector 48 c to 71 sector 76-80 aerocity rhs and lhs- it city sector 88-89 and sector dividing roads of gmada at sas nagar
Eradication of congress grass herbaceous and other wild growth form sector 48 c to 71 sector 76-80 aerocity rhs and lhs- it city sector 88-89 and sector dividing roads of gmada at sas nagar
Read moreRepairing, reconditioning and repalcment of spares for 850kw, 6.6kv, ht motor-04 at peddapur ph-iv pumping station, overhauling and replacements of spares for air compressor-01 at ph-iii, peddapur including dismantling, loading, transportation, uploading, erection,testing and commissioning of ht motor and air compressor under mwss, eam cell, peddapur, td-ii, patancheru
Repairing, reconditioning and replacements of spares for 850kw,6.6kv,ht motor-04 at peddapur phase-iv pumping station, overhauling and replacements of spares for air compressor-01 at phase-iii, peddapur including dismantling, loading, transportation, uploading, erection,testing and commissioning of ht motor and air compressor under mwss, eam cell, peddapur,transmission division no.ii, patancheru
Read moreShifting of 300 kld and 200 kld stps based on mbr technology including dismantling loading transportation erection commissioning and testing complete in all respects from aerocity to it city and sector 88/89 sas nagar including one year of mtc.
Shifting of 300 kld and 200 kld stps based on mbr technology including dismantling loading transportation erection commissioning and testing complete in all respects from aerocity to it city and sector 88/89 sas nagar including one year of mtc.
Read moreRepairing, reconditioning and replacements of spares for 132/6.6 kv, 10/16 mva power transformer, rewinding and reconditioning of 1000kw and 850 kw, 6.6 kv, ht motors at peddapur 132 kv substation and iii and iv pumping station, including dismantling, loading, transportation, unloading, erection, testing and commissioning of 132/6.6 kv, 10/16 mva power transformer and ht motors under mwss, eam cell-ii, peddapur, o and m division viii, patancheru
Repairing, reconditioning and replacements of spares for 132/6.6kv, 10/16 mva power transformer, rewinding and reconditioning of 1000kw and 850kw, 6.6kv, ht motors at peddapur 132 kv sub-station and iii and iv pumping stations, including dismantling, loading, transportation, unloading erection, testing and commissioning of 132/6.6kv, 10/16 mva power transformer and ht motors under mwss, eam cell-ii, peddapur, omdivision no.viii, patancheru
Read moreManufacturing supply erection testing and commissioning of 1250 amp lt panel suitable as per site including all necessary accessories and dismantling and shifting of old lt panels in store at chaudhary charan singh dalmau a pump canal stage 1st
Manufacturing supply erection testing and commissioning of 1250 amp lt panel suitable as per site including all necessary accessories and dismantling and shifting of old lt panels in store at chaudhary charan singh dalmau a pump canal stage 1st
Read moreRepairing, reconditioning and replacements of spares for 132/6.6 kv, 10/16 mva power transformer, rewinding and reconditioning of 1000kw and 850 kw, 6.6 kv, ht motors at peddapur 132 kv substation and iii and iv pumping station, including dismantling, loading, transportation, unloading, erection, testing and commissioning of 132/6.6 kv, 10/16 mva power transformer and ht motors under mwss, eam cell-ii, peddapur, o and m division viii, patancheru
Repairing, reconditioning and replacements of spares for 132/6.6kv, 10/16 mva power transformer, rewinding and reconditioning of 1000kw and 850kw,6.6kv, ht motors at peddapur 132 kv sub-station and iii and iv pumping stations, including dismantling, loading, transportation, unloading, erection, testing and commissioning of 132/6.6kv,10/16 mva power transformer and ht motors under mwss, eam cell-ii, peddapur, o and m division no.viii, patancheru
Read moreSite survey planning design engineering supply of material erection testing and commissioning of all material in all respects required to complete the rdss works in babyal no 1 and no 2 sub divisions of ambala cantt division under ambala
Site survey planning design engineering supply of material erection testing and commissioning of all material in all respects required to complete the rdss works in babyal no 1 and no 2 sub divisions of ambala cantt division under ambala
Read moreof your Industry type