Tender Details
Particulars | Details |
---|---|
Title |
Pmmsy Modernisation Of Existing Fishing Harbour At Puthiyappa In Kozhikode District Of Kerala Under Pmmsy Supply, Installation Testing And Commissioning Of Pressure Washer And Cleaning Equipment
|
Description |
Supply And Installation Of High Pressure Washer With 3 Phase Motor Installed At The Rear Side Of The Vehicle With 2 Nos Of 500 Litre Capacity Water Tank
|
Organisation | Harbour Engineering Department | State Govt. and UT |
Tender Id | 2024_HED_711627_1 |
Reference Number |
HED/CEHED/TR/944/2024_5_1_1/1 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | Puthiyappa |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1120565 |
Start Date | December 04, 2024 14:30 |
End Date |
11/12/2024 ( Expired 155 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply installation testing and commissioning of chemical
Supply installation testing and commissioning of chemical
Read moreSupply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreSupply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreDesign, supply, installation and commissioning with three (03) years comprehensive maintenance of dynamic creative illumination at maithon and panchet dam and various fountains proposed at maithon dam
Design, supply, installation and commissioning with three (03) years comprehensive maintenance of dynamic creative illumination at maithon and panchet dam and various fountains proposed at maithon dam
Read moreSupply and installation commissioning of semi automatic punch instrument for iem screening at aiims bhubaneswar
Supply and installation commissioning of semi automatic punch instrument for iem screening at aiims bhubaneswar
Read moreSupply, installation, testing and commissioning of air conditioning and ventilation of rup plant exhaust system at frfcf, kalpakkam
Supply, installation, testing and commissioning of air conditioning and ventilation of rup plant exhaust system at frfcf, kalpakkam
Read moreDesign, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Read moreSupply installation testing and commissioning of nifps at 132 kv substation roorkee bhagwanpur and bhupatwala under oandm circle roorkee
Supply installation testing and commissioning of nifps at 132 kv substation roorkee bhagwanpur and bhupatwala under oandm circle roorkee
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreof your Industry type