Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Drainage Channel For Management Of Grey Water With Soak Pit From Kayenati Masjid To House Of Mostakin Molla Under Patharghata Gram Panchayat Under Rajarhat Block
|
Description |
Construction Of Drainage Channel&Amp#X0d
For Management Of Grey Water&Amp#X0d
With Soak Pit From Kayenati Masjid&Amp#X0d
To House Of Mostakin Molla Under&Amp#X0d
Patharghata Gram Panchayat&Amp#X0d
Under Rajarhat Block
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id | 2024_ZPHD_756612_1 |
Reference Number |
357/PTG.GP/2024 |
Tender Fee | 500 |
EMD | 6303 |
Tender Value | |
Place | PATHARGHATA |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1672502 |
Start Date | September 24, 2024 18:30 |
End Date |
01/10/2024 ( Expired 231 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreAllotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreUnder central government sponsored amrut 2.0 program pune municipal corporation invites e tender for the work of construction of 125 mld capacity water treatment plant phase 3 with operation and maintenance of the wtp for 7 years at vadgaon, pune
Under central government sponsored amrut 2.0 program pune municipal corporation invites e tender for the work of construction of 125 mld capacity water treatment plant phase 3 with operation and maintenance of the wtp for 7 years at vadgaon, pune
Read moreConstruction, widening, beuatification and drainage for storm water road from shisham tiraha to kalibagichi to heeradas circle chamad mata mandir to sarso anusandhan kendra bharatpur.
Construction, widening, beuatification and drainage for storm water road from shisham tiraha to kalibagichi to heeradas circle chamad mata mandir to sarso anusandhan kendra bharatpur.
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreConstruction of rcc elevated over head reservoir (intze type) of capacity 400 cum at zone- 6, ward -11 with house service connection of zone-6 within buniadpur municipality under proposed water supply scheme of amrut 2.0
Construction of rcc elevated over head reservoir (intze type) of capacity 400 cum at zone- 6, ward -11 with house service connection of zone-6 within buniadpur municipality under proposed water supply scheme of amrut 2.0
Read moreConstruction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme o
Construction of rcc elevated over head reservoir (intze type) of capacity 600 cum at zone- 7, ward -4 with house service connection at zone 1 and 2 and jack pushing under sh of zone-7 within buniadpur municipality under proposed water supply scheme o
Read moreof your Industry type